Description

Sealed bids for the construction of the Florence Lane PS Electrical Upgrades, Project No. C12831 (Project) for Tualatin Valley Water District (Owner) will be accepted by Heather Speight, Procurement and Contract Administrator, via Equity Hub’s Bid Locker at https://bidlocker.us/details/4914_Florence_Lane_Ps_Electrical_Upgrades_Itb (Bid Locker), until 2:00 p.m. local time on May 28, 2025 (2:00 PM). Bidders must sign up with Bid Locker at https://bidlocker.us/a/tvwd/BidLocker before being allowed to submit a bid.  There is no cost to register.  Any bids received after the Bid Closing Time will not be considered.

Registration with Bid Locker requires a correctly completed Confidentiality Agreement, which is available through the registration process.  Following completion of the requested vendor information and upload of the Confidentiality Agreement, the vendor profile will be sent for manual approval.  Please allow one business day for your vendor profile to be approved.  If it has not been approved within one business day, or if you have questions about this process, please contact bidsandproposals@tvwd.org. Bidders are advised to ensure that their Bid Locker vendor profile is active and approved a minimum of three business days prior to the Bid Closing Time to prevent any issues with submitting a bid on time.

Bids received by the Bid Closing Time will be publicly opened and read aloud immediately thereafter on a conference call at 971.300.4841, phone conference ID 602 555 483#.

Bidders are required to submit a First Tier Subcontractor Disclosure Form (First Tiers), as described by ORS 279C.370.  The First Tiers must be submitted to Bid Locker within two hours of the Bid Closing Time.  The Owner must reject a bid if the Bidder fails to submit the First Tiers to Bid Locker within two hours of the Bid Closing Time.  Original copies of the Bid Security must be submitted to Owner within five business days of the Bid Closing Time as prescribed in Section 00 21 13.

The project consists of furnishing required labor, equipment, and materials for construction of the following:

1.       Obtain electrical permits from the local jurisdiction.

2.       Provide and install approximately 250 feet of new buried conduit, 150 KVA PGE transformer, transformer pad, and meter, including backfilling and compaction.

3.       Provide and install generator load bank connection and Manual Transfer Switch with portable generator connection.

4.       Provide and install two electric heaters and replace light fixtures in pump station.

5.       Install new conduit (Contractor provided), automatic transfer switch (ATS), remote terminal unit (RTU) and motor control center (MCC) within the pump station and to new generator. Owner will provide the ATS, MCC, and generator.

6.       Demolish and remove existing RTU as shown in contract drawings and in coordination with Owner.

The Engineer’s estimate for this Project is $125,000 to $155,000.

All work is to be completed according to the schedule provided in the Contract documents.  District intends to issue Notice to Proceed date no later than September 1, 2025.

Bid Documents may be obtained electronically from Bid Locker or in in either electronic or hard copy format by contacting Plan Center Northwest, PO Box 2486, Clackamas, OR 97015, Phone: (503) 650-0148, Fax: (503) 650-8273, email: megan@plancenternw.com, plancenternw.com.

If a potential Bidder obtains the Bid documents from Plan Center Northwest, the Bidder is still responsible for registering with Bid Locker to submit their bid.

Addenda will be published to Bid Locker.  Bidders who download bid packages from Bid locker will automatically be notified via email when addenda are published.  It is the responsibility of the Bidder to obtain all addenda. Bidders are responsible for the cost of obtaining and/or printing the Bid Documents. The Bidder, including subcontractors, will also be responsible for signing a confidentiality agreement prior to obtaining the documents. Return of the documents is not required, and the amount paid for the Bid Documents is nonrefundable.

There will NOT be a pre-bid conference for this Project.

Contractors must be qualified in accordance with the applicable parts of ORS 279 to enter into a contract with the Owner for public work in Oregon.  Bidders are required to complete and submit Section 00 45 13, “Statement of Bidder’s Qualifications” with their bid.  The Owner will investigate and determine if the qualifications of the apparent low Bidder meet the minimum requirements as part of its evaluation of the lowest responsive and responsible bid.

No bid will be received or considered by the Owner unless the Bid Form contains, or is accompanied by, a statement by the Bidder as a part of the bid that the provisions required by ORS 279C.800 through 279C.870 pertaining to prevailing wages are included in this Contract.  Contractor licensing under ORS 468A.720 for asbestos abatement is not a requirement of this Project. Each bid must contain a statement as to whether the bidder is a resident bidder as defined in ORS 279A.120.  Each bid must contain a statement as to whether the bidder is registered with the Oregon Construction Contractors Board in accordance with the provisions of ORS 279C.365.

Bids must be submitted on the prescribed forms and must be accompanied by a certified check or bid bond executed in favor of Tualatin Valley Water District in an amount not less than five (5) percent of the amount bid as described in Paragraph 11.1 of Section 00 21 13 Instructions to Bidders.  The successful Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract as prescribed in the Contract Documents.

The Owner reserves the right to reject all bids not in compliance with all prescribed public contracting procedures and requirements, including bidder responsibility under ORS 279C.375(3)(b), and may reject for good cause all bids upon the Owner’s finding that it is in the Owner’s or the public’s best interest to do so. The Owner reserves the right to waive informalities and to award a Contract to the qualified lowest responsive and responsible Bidder.

For more information regarding this Project contact Zach Lemberg, Project Manager with Tualatin Valley Water District at zach.lemberg@tvwd.org.

Published April 30, 2025 and May 7, 2025



Line Items

This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:

Item No Item Unit of Measure Cost Required?
1 Mobilization (Max 5% of Bid Total) 1 Cost Requested Required
2 Health and Safety 1 Cost Requested Required
3 Temporary Traffic Control 1 Cost Requested Required
4 Erosion Control 1 Cost Requested Required
5 Complete Electrical Upgrades and Conduit Installation 1 Cost Requested Required
6 Permanent Asphalt Concrete Trench Restoration 35 Cost Requested Required

Download Line Items as .CSV

Attachments

This project has the following solicitation documents.

Bid Document File Size Notes
2,475,306
15,967,372

You will need to:

  • Unchecked Be logged into Bid Locker
  • Unchecked Be registered with Tualatin Valley Water District

Vendor Questions and Answers

Submitted Questions About This Bid

There are no questions that have been answered and posted by Tualatin Valley Water District.

For Questions or Additional Information, Contact:

Name: Heather Speight
Email: bidsandproposals@tvwd.org

For Technical Questions, Contact:

Zach Lemberg, zach.lemberg@tvwd.org

Interested Parties and Planholders

Interested Parties

These are the vendors who have expressed interest in this solicitation:

Business When
DJC Oregon Project Center Apr 30, 2025
Plan Center Northwest Apr 30, 2025
(plan center)
Seattle Daily Journal of Commerce Apr 30, 2025
(plan center)

Planholders

These are the vendors who have downloaded the solicitation documents:

Business When
Bolton Contracting, LLC May 1, 2025
Far West Fibers, Inc. Apr 30, 2025

Commodity Codes

Commodity Codes (NIGP):

914-38
Electrical

About Tualatin Valley Water District

Contracting with TVWD

TVWD is a special district, established to provide drinking water, and is governed by an elected Board of Commissioners.  Because some of the information in our solicitations is confidential and protected under US law, all vendors are required to complete a Confidentiality Agreement prior to their TVWD Bid Locker profile being approved. This approval is a manual process.  Please allow one business day for approval and follow any emailed instructions received. TVWD is not responsible for vendors who cannot download and/or submit solicitation responses due to vendor profiles that are not approved.

Public agencies with questions about a solicitation should call 503.848.3055 or email bidsandproposals@tvwd.org for information.  Vendors who reach out directly will be redirected to the instructions in the specific solicitation or other emailed instructions.

Share: