Nyberg Creek Trail Project
Solicitation Type: | ITB |
---|---|
Category: | Public Improvements |
Department: | Parks & Recreation |
Issued by: | City of Tualatin, OR |
Publish Date: | Jun 23, 2025 5:00AM |
Bids Due Date: |
Jul 15, 2025 2:00PM
(Pacific Daylight Time)
|
Price Range: | 1,800,000 |
Status: | Open |
Description
City of Tualatin is accepting sealed bids (“Bids”) for the NYBERG CREEK TRAIL PROJECT until 2:00 pm (local time), July 15, 2025, (“Bid Closing”) through the City’s bid management portal at https://bidlocker.us/a/tualatinoregon (“Bid Portal”). Bids must be submitted electronically through the Bid Portal; late bids or bids submitted by any other means will not be accepted. Richard Contreras, Contracts & Procurement Analyst, is the designated contact for this solicitation and can be reached at rcontreras@tualatin.gov or (503) 691-3080 for questions regarding bid submission. There will be no public bid opening. A list of bidders and preliminary bid totals will be posted to the Bid Portal promptly after the Bid Closing.
The First-Tier Subcontractor Disclosure Form must be submitted through the Bid Portal no later than 4:00 pm (local time), July 15, 2025, two working hours after the Bid Closing. Instructions for providing the First-Tier Subcontractor Disclosure and the required disclosure form are included in the Contract Documents.
THE CITY WILL REJECT A BID IF THE BIDDER FAILS TO SUBMIT THE DISCLOSURE FORM WITH THIS INFORMATION BY THE STATED DEADLINE.
IDENTIFICATION OF PROJECT: The project consists of two distinct scopes of work, identified as Schedule A and Schedule B. Schedule A constitutes the base bid. Schedule B is a single additive alternate. If the Tualatin Parks and Recreation Department elects to proceed with the additive alternate, all work under Schedule B shall be completed under the same mobilization and within the same Contract Time as Schedule A. Major items of work consist of the following:
Schedule A:
- Construction of a concrete trail section that includes, embankment, excavation, tree removal, retaining wall construction, and grubbing and clearing of open space area.
- Installation of the parking lot light with a PGE service connection.
- Existing waterline potholing and depth adjustment.
- Fencing and Signage installation
Schedule B:
- Additional Aggregate to be used in the event of conditions that necessitate over excavation of soil, wet weather paving sections or for construction vehicles access as approved on a case-by-case basis.
Contract Documents, including plans and specifications, may be obtained and examined at the City’s Bid Portal at https://bidlocker.us/a/tualatinoregon by creating an account and joining the plan holders list.
CONTRACT TIME: The Contractor shall begin work within 30 calendar days of receiving the Notice to Proceed. Substantial Completion of all work must be achieved within 210 calendar days from the start of work, and Final Completion within 270 calendar days from the start of work.
OTHER BID REQUIREMENTS: No proposal for a construction contract shall be received or considered by the City unless the firm is registered with the Construction Contractors Board or is licensed by the State Landscape Contractors Board, as applicable, as specified in OAR 137-049-0230.
Proposals must include a signed Proposal Form and a Bid Security in the form of either a proposal bond or certified check in an amount not less than ten percent (10%) of the total bid. Proposal bonds may be submitted as scanned PDFs or digitally issued and uploaded directly through the Bid Portal. If submitting a scanned proposal bond, the original physical bond must be delivered to the City within five (5) business days following the bid deadline. Certified checks must be delivered in person to the City prior to the bid deadline; late delivery of certified checks will result in bid rejection.
This is a contract for a public work, subject to ORS 279C.800 to 279C.870 and prevailing wage is required. Contractor must comply fully with the provisions of ORS 279C.800 through 279C.870. Contractor and subcontractors shall pay the Oregon Bureau of Labor and Industries (BOLI) wages to workers. Wage rates may be found at the following website:
https://www.oregon.gov/boli/employers/Pages/prevailing-wage-rates.aspx
Every subcontract must contain a provision requiring payment of prevailing wage pursuant to the provisions of ORS 279C.800 through 279C.870. Contractor and all subcontractors must file or cause to be filed the certified statements with the BOLI, as provided in ORS 279C.845.
The bid must indicate whether the contractor is a resident contractor, as defined in ORS 279A.120.
RIGHT OF REJECTION: The City of Tualatin reserves the right to reject any bid not in compliance with all prescribed public procedures and requirements, and may reject for good cause any or all bids upon a finding that it is in the public interest to do so. Bids cannot be withdrawn within thirty (30) after the Bid Closing.
WRITTEN ADDENDA: The City reserves the right to make changes to the Invitation to Bid and the Contract Documents by written addenda prior to the Bid Closing. Addenda shall be made available to all contractors who have joined the plan holders list on the Bid Portal, as provided in the Contract Documents. The City bears no responsibility for information posted or excluded by third-party document centers.
Dated this 23rd day of June, 2025.
CITY OF TUALATIN
(County of Washington, State of Oregon)
Published in the Daily Journal of Commerce on June 23, 2025
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
Item No | Item | Unit of Measure | Quantity | Cost | Required? |
---|---|---|---|---|---|
1 | Mobilization | LS | 1.00 |
![]() |
![]() |
2 | Construction Entrance | EA | 3.00 |
![]() |
![]() |
3 | Concrete Washout Facility | EA | 2.00 |
![]() |
![]() |
4 | Sediment Fence | LF | 2296.00 |
![]() |
![]() |
5 | Tree Protection Fencing | LF | 2947.00 |
![]() |
![]() |
6 | Construction Fencing | LF | 200.00 |
![]() |
![]() |
7 | Inlet Protection, Type 5 | EA | 10.00 |
![]() |
![]() |
8 | Straw Wattles | LF | 2911.00 |
![]() |
![]() |
9 | Diversion Dikes | LF | 152.00 |
![]() |
![]() |
10 | Soil Stockpile | LS | 1.00 |
![]() |
![]() |
11 | Slope Stabilization Matting | SY | 794.00 |
![]() |
![]() |
12 | Construction Staking | LS | 1.00 |
![]() |
![]() |
13 | Potholing Existing Utilities | EA | 10.00 |
![]() |
![]() |
14 | Remove Existing Curb | LF | 65.00 |
![]() |
![]() |
15 | Remove Existing Sidewalk | SY | 4.00 |
![]() |
![]() |
16 | Remove Existing Barricade | LS | 1.00 |
![]() |
![]() |
17 | Remove and Relocate Existing Utility | LS | 1.00 |
![]() |
![]() |
18 | Remove Existing Speed Bump | LS | 1.00 |
![]() |
![]() |
19 | Remove Existing Fence | LS | 1.00 |
![]() |
![]() |
20 | Remove Existing Retaining Wall | LS | 1.00 |
![]() |
![]() |
21 | Tree Removal (6” Diameter or Greater) | EA | 57.00 |
![]() |
![]() |
22 | Tree Trimming and Limbing (over path) | LS | 1.00 |
![]() |
![]() |
23 | Clearing & Grubbing (Including trees less than 6” Diameter) | LS | 1.00 |
![]() |
![]() |
24 | General Excavation | CY | 946.00 |
![]() |
![]() |
25 | General Embankment | CY | 1754.00 |
![]() |
![]() |
26 | Haul Off (Strippings) | CY | 692.00 |
![]() |
![]() |
27 | Import (Clean Fill) | CY | 480.00 |
![]() |
![]() |
28 | Subgrade Geotextile, Nonwoven | SY | 927.00 |
![]() |
![]() |
29 | ODOT Class 50 Riprap | CY | 8.00 |
![]() |
![]() |
30 | Infiltration Trenches | CY | 125.00 |
![]() |
![]() |
31 | Rocked Swales | CY | 15.00 |
![]() |
![]() |
32 | 6" ASTM D3034 PVC (SDR35) Storm Pipe | LF | 34.00 |
![]() |
![]() |
33 | 12" Nyloplast Catch Basin | EA | 1.00 |
![]() |
![]() |
34 | 24" Nyloplast Catch Basin | EA | 1.00 |
![]() |
![]() |
35 | Storm Manhole Rim Adjustments | EA | 6.00 |
![]() |
![]() |
36 | Connection to Existing Manhole | EA | 1.00 |
![]() |
![]() |
37 | Metal Handrail, 4 Rails (Powder Coated) | LF | 118.00 |
![]() |
![]() |
38 | Trash Receptacles | EA | 2.00 |
![]() |
![]() |
39 | Dog Waste Stations | EA | 5.00 |
![]() |
![]() |
40 | Steel Benches | EA | 4.00 |
![]() |
![]() |
41 | Lock N Load Retaining Walls | SF | 1857.00 |
![]() |
![]() |
42 | Masonry Block Retaining Walls | SF | 634.00 |
![]() |
![]() |
43 | 3/4"-0" Aggregate Base | CY | 572.00 |
![]() |
![]() |
44 | Speed Hump | EA | 1.00 |
![]() |
![]() |
45 | Concrete Curb and Gutter | LF | 7.00 |
![]() |
![]() |
46 | Concrete Curbs | LF | 134.00 |
![]() |
![]() |
47 | Concrete Pavement - 6" | SF | 26911.00 |
![]() |
![]() |
48 | Concrete Pavement - Thickened Edge | SF | 3998.00 |
![]() |
![]() |
49 | Concrete Stairs | CY | 1.00 |
![]() |
![]() |
50 | Extra for New Curb Ramps | EA | 2.00 |
![]() |
![]() |
51 | Truncated Domes on New Surfaces | SF | 42.00 |
![]() |
![]() |
52 | Fold-down Bollards | EA | 4.00 |
![]() |
![]() |
53 | Bollard Striping | LF | 135.00 |
![]() |
![]() |
54 | Crosswalk Striping | SF | 80.00 |
![]() |
![]() |
55 | Remove and Relocate Existing Sign | LS | 1.00 |
![]() |
![]() |
56 | Perforated Steel Square Tube Anchor Sign Supports | LS | 9.00 |
![]() |
![]() |
57 | Signs, Standard Sheeting, Sheet Aluminum | SF | 48.00 |
![]() |
![]() |
58 | Clean Water Services Natural Area Signage (Installed on Fence) | EA | 10.00 |
![]() |
![]() |
59 | Weight Limit Signage (Installed on Fence) | EA | 4.00 |
![]() |
![]() |
60 | Interpretive Sign | EA | 1.00 |
![]() |
![]() |
61 | Light Installation with service line (Directional Bored) | LS | 1.00 |
![]() |
![]() |
62 | Grass Seeding | SY | 3200.00 |
![]() |
![]() |
63 | Shrub Planting | EA | 925.00 |
![]() |
![]() |
64 | Tree Planting | EA | 47.00 |
![]() |
![]() |
65 | Chain Link Fencing | LF | 251.00 |
![]() |
![]() |
66 | Split Rail Fencing (Two Rail) | LF | 1200.00 |
![]() |
![]() |
67 | Split Rail Fencing (Three Rail) | LF | 823.00 |
![]() |
![]() |
68 | Split Rail Fencing (Three Rail with Wire Mesh) | LF | 1012.00 |
![]() |
![]() |
69 | Split Rail Fencing Gate | EA | 3.00 |
![]() |
![]() |
70 | Irrigation Valve Rim Adjustment | EA | 2.00 |
![]() |
![]() |
71 | 8 Inch Connection to 8 Inch Existing Main | EA | 4.00 |
![]() |
![]() |
72 | Concrete Straddle Thrust Block | EA | 4.00 |
![]() |
![]() |
73 | 8 Inch Ductile Iron Pipe, Fittings, and Couplings with Restrained Joints and Class C Backfill | LF | 386.00 |
![]() |
![]() |
74 | Water Valve Rim Adjustment | EA | 1.00 |
![]() |
![]() |
75 | Water Meter Rim Adjustment | EA | 1.00 |
![]() |
![]() |
Item No | Item | Unit of Measure | Quantity | Cost | Required? |
---|---|---|---|---|---|
76 | Aggregate Subbase (1-1/2”-0”) (Additional Aggregate for Over excavation and Wet Weather sections, as needed) | CY | 400.00 |
![]() |
![]() |
Attachments
This project has the following solicitation documents.
Vendor Questions and Answers
Submitted Questions About This Bid
There are no questions that have been answered and posted by City of Tualatin, OR.
For Questions or Additional Information, Contact:
Name: City of Tualatin Procurement
Email: rcontreras@tualatin.gov
Interested Parties and Planholders
Interested Parties
These are the vendors who have expressed interest in this solicitation:
Business | When |
---|---|
Berrien Concrete LLC | Jun 23, 2025 |
Brown Contracting, Inc. | Jun 23, 2025 |
Dirt and Aggregate Interchange | Jun 23, 2025 |
Emery & Sons Construction Group, LLC | Jun 23, 2025 |
Kerr Contractors Oregon, LLC | Jun 23, 2025 |
Kodiak Pacific Construction | Jun 23, 2025 |
The Saunders Company | Jun 23, 2025 |
Turney Excavating Inc. | Jun 23, 2025 |
Planholders
These are the vendors who have downloaded the solicitation documents:
Business | When |
---|---|
Berrien Concrete LLC | Jun 23, 2025 |
Brown Contracting, Inc. | Jun 23, 2025 |
Core And Main | Jun 23, 2025 |
D&D Concrete & Utilities, Inc. | Jun 23, 2025 |
Emery & Sons Construction Group, LLC | Jun 23, 2025 |
Eugene Builders Exchange | Jun 23, 2025 |
Kerr Contractors Oregon, LLC | Jun 23, 2025 |
Kodiak Pacific Construction | Jun 23, 2025 |
Net Zero Energy | Jun 23, 2025 |
Paul Brothers Inc | Jun 23, 2025 |
Plan Center Northwest | Jun 23, 2025 |
Premier Builders Exchange | Jun 23, 2025 |
Salem Contractors Exchange | Jun 23, 2025 |
Seattle Daily Journal of Commerce | Jun 23, 2025 |
Southwest Washington Contractors Association | Jun 23, 2025 |
Spokane Regional Plan Center | Jun 23, 2025 |
The Saunders Company | Jun 23, 2025 |
Turney Excavating Inc. | Jun 23, 2025 |
About City of Tualatin, OR
With nearly 28,000 residents, the City of Tualatin is a dynamic, vibrant community conveniently located just 12 miles south of Portland and 30 miles north of Salem, the state capital. Situated at the intersection of Interstate highways 5 and 205, Tualatin is a short distance to adventure, from the Cascade Mountain Range to the Oregon Coast.
Share:
Your submitted questions |
---|