Basalt Creek Linear Park
| Solicitation Type: | ITB |
|---|---|
| Category: | Public Improvements |
| Department: | Parks & Recreation |
| Issued by: | City of Tualatin, OR |
| Publish Date: | Feb 3, 2026 5:00PM |
| Bids Due Date: |
Feb 26, 2026 2:00PM
(Pacific Standard Time)
|
| Price Range: | 400000 |
| Status: | Open |
Description
City of Tualatin is accepting bids for its BASALT CREEK LINEAR PARK project until 2:00 pm (local time), February 26, 2026, via the City’s bid management portal at https://bidlocker.us/a/tualatinoregon (“Bid Portal”), where Contract Documents may be reviewed. Specifications may also be reviewed at City Offices, located at 18880 SW Martinazzi Ave., Tualatin, OR 97062.
Bids must be submitted electronically through the Bid Portal; bids submitted by any other means will not be accepted. Richard Contreras, Contracts & Procurement Analyst, is the designated contact for this solicitation and can be reached at rcontreras@tualatin.gov or (503) 691-3080.
The City will host a virtual public bid opening at 2:15 pm (local time), February 26, 2026. Please see the Bid Portal for access instructions. A list of bidders and preliminary bid totals will be posted to the Bid Portal promptly after the virtual bid opening.
First-Tier Subcontractor Disclosure must be submitted via the Bid Portal no later than 4:00 pm (local time), February 26, 2026, two working hours after the Bid Closing.
IDENTIFICATION OF PROJECT: Major items of work consist of the following:
Minor site improvements for a 0.34 acre site including concrete walkway, small gathering area, site furnishings, and plantings; provision of power and water line for irrigation system for trees, shrubs, and rain garden water quality facility; provision of water and drain line for accessible drinking fountain.
This is a contract for a public work, subject to ORS 279C.800 to 279C.870 and prevailing wages are required. Contractor must comply fully with the provisions of ORS 279C.800 through 279C.870. Contractor and subcontractors shall pay Oregon Bureau of Labor and Industries (BOLI) wages to workers for each category of labor, as applicable. Bidders are responsible for quoting labor correctly and no adjustments will be allowed. Wage rates may be found at the following websites:
https://www.oregon.gov/boli/employers/Pages/prevailing-wage-rates.aspx
Published in the Daily Journal of Commerce on February 4, 2026.
Special Instructions
The City will host a virtual public bid opening at 2:15 pm (local time), February 26, 2026, the meeting link is posted below:
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
| Item No | Item | Unit of Measure | Quantity | Cost | Required? |
|---|---|---|---|---|---|
| 1 | Mobilization | LS | 1.00 |
|
|
| 2 | Silt fence | LF | 740.00 |
|
|
| 3 | Inlet protection | EA | 4.00 |
|
|
| 4 | Clear and grub | SF | 16250.00 |
|
|
| 5 | Demo gravel, boulders, cobbles | SF | 8700.00 |
|
|
| 6 | Demo asphalt | SF | 400.00 |
|
|
| 7 | Saw cut | LF | 70.00 |
|
|
| 8 | Site earthwork – cut | CY | 185.00 |
|
|
| 9 | Site earthwork – fill | CY | 58.00 |
|
|
| 10 | Rough grading – site and staging area | SF | 25400.00 |
|
|
| 11 | Base aggregates, 6” depth | CY | 71.00 |
|
|
| 12 | Concrete paving – vehicular, pathway | SF | 2590.00 |
|
|
| 13 | Concrete paving – pedestrian, plaza and sidewalk | SF | 952.00 |
|
|
| 14 | Concrete curbing – standard | LF | 5.00 |
|
|
| 15 | Asphalt paving – full depth | SF | 20.00 |
|
|
| 16 | Asphalt paving – grind and inlay | SF | 325.00 |
|
|
| 17 | Asphalt paving – striping | SF | 345.00 |
|
|
| 18 | Bollards, fold down | EA | 2.00 |
|
|
| 19 | Trash receptacles | EA | 1.00 |
|
|
| 20 | Bench with back | EA | 2.00 |
|
|
| 21 | Swing bench | EA | 1.00 |
|
|
| 22 | Drinking fountain (3 fixture) | EA | 1.00 |
|
|
| 23 | Sign – stormwater | LS | 1.00 |
|
|
| 24 | Deciduous trees – 3” cal. swamp white oak | EA | 5.00 |
|
|
| 25 | Deciduous trees – 2” cal. cascara buckthorn | EA | 2.00 |
|
|
| 26 | Deciduous trees – 2” cal. columnar Persian ironwood single stem | EA | 6.00 |
|
|
| 27 | Native planting area – 6” amended topsoil | CY | 194.00 |
|
|
| 28 | Native planting area – Lawn Bloomers seed mix, 1lb per 1,000 SF | SF | 10455.00 |
|
|
| 29 | CWS rain garden – bioretention soil | CY | 33.00 |
|
|
| 30 | CWS rain garden – crushed drain rock | CY | 22.00 |
|
|
| 31 | CWS rain garden – storm energy dissipator drain rock | CY | 12.50 |
|
|
| 32 | CWS rain garden – 18” amended topsoil | CY | 24.00 |
|
|
| 33 | CWS rain garden – 3” mulch | CY | 4.00 |
|
|
| 34 | CWS rain garden – common camas, 1 gal. | EA | 80.00 |
|
|
| 35 | CWS rain garden – Douglas iris, 1 gal. | EA | 50.00 |
|
|
| 36 | CWS rain garden – dense sedge, 1 gal. | EA | 100.00 |
|
|
| 37 | CWS rain garden – spreading rush, 1 gal. | EA | 100.00 |
|
|
| 38 | CWS rain garden – tufted hair grass, 1 gal. | EA | 100.00 |
|
|
| 39 | CWS rain garden – Oregon box leaf, 1 gal. | EA | 10.00 |
|
|
| 40 | CWS rain garden – Kelsey dogwood, 1 gal. | EA | 7.00 |
|
|
| 41 | Irrigation – tree bubblers | SF | 430.00 |
|
|
| 42 | Irrigation – sprinkler pop-ups | SF | 600.00 |
|
|
| 43 | Irrigation – CWS rain garden | SF | 600.00 |
|
|
| 44 | Irrigation controller | EA | 1.00 |
|
|
| 45 | Water supply – connection to existing | EA | 1.00 |
|
|
| 46 | Water supply – ¾” pipe incl. trenching and backfilling | LF | 335.00 |
|
|
| 47 | Water supply – DCVA | EA | 1.00 |
|
|
| 48 | Sanitary sewer connection to drinking fountain | LS | 1.00 |
|
|
| 49 | Sanitary sewer lateral – 4” piping, incl. trenching, backfill | LF | 29.00 |
|
|
| 50 | Sanitary connection to manhole | EA | 1.00 |
|
|
| 51 | Storm sewer – connection to existing storm pipe | EA | 1.00 |
|
|
| 52 | Storm sewer – 8” piping, incl. trenching, backfill | LF | 22.00 |
|
|
| 53 | Storm sewer – overflow | EA | 1.00 |
|
|
| 55 | Electrical transformer pad | EA | 1.00 |
|
|
| 56 | Electrical meter service pedestal | EA | 1.00 |
|
|
| 57 | In-grade receptacle quadplex | EA | 1.00 |
|
|
| 58 | Electric conduit – 1” incl. trench and backfill | LF | 98.00 |
|
|
| 59 | Electric PVC conduit – 2” incl. trench and backfill | LF | 21.00 |
|
|
| 60 | Electric PVC conduit – 3” incl. trench and backfill | LF | 43.00 |
|
|
| 61 | Conductor - #12 AWG | LF | 175.00 |
|
|
| 62 | Conductor - #10 AWG | LF | 200.00 |
|
|
| 63 | Ground conductor - #4 AWG | LF | 30.00 |
|
|
| 64 | Ground rods | EA | 2.00 |
|
|
Attachments
This project has the following solicitation documents.
Vendor Questions and Answers
Submitted Questions About This Bid
These are vendor questions for which the agency has supplied an answer.
| Questions |
|---|
|
Asked Feb 6, 2026 9:54AM
Question:
Will there be a pre-bid meeting for this project? |
|
Answer:
No pre-bid meeting is scheduled. |
For Questions or Additional Information, Contact:
Name: City of Tualatin Procurement
Email: rcontreras@tualatin.gov
Interested Parties and Planholders
Interested Parties
These are the vendors who have expressed interest in this solicitation:
| Business | When |
|---|---|
| ASM Affiliates | Feb 4, 2026 |
| Braun Construction & Design, LLC | Feb 6, 2026 |
| Brown Contracting, Inc. | Feb 3, 2026 |
| DJC Oregon Project Center | Feb 4, 2026 |
| Eugene Builders Exchange | Feb 4, 2026 |
| Faison Construction Inc. | Feb 5, 2026 |
| Fulcrum Construction | Feb 4, 2026 |
| Grasstains LLC | Feb 4, 2026 |
| Kodiak Pacific Construction | Feb 4, 2026 |
| Nutter Corporation | Feb 5, 2026 |
| Plan Center Northwest | Feb 4, 2026 |
| RA Gray Construction | Feb 6, 2026 |
| Salem Contractors Exchange | Feb 4, 2026 |
| Seattle Daily Journal of Commerce | Feb 4, 2026 |
| Tri-City Construction Council | Feb 4, 2026 |
Planholders
These are the vendors who have downloaded the solicitation documents:
| Business | When |
|---|---|
| AG Yard Care LLC | Feb 5, 2026 |
| ASM Affiliates | Feb 4, 2026 |
| Brown Contracting, Inc. | Feb 3, 2026 |
| DJC Oregon Project Center | Feb 4, 2026 |
| Eugene Builders Exchange | Feb 4, 2026 |
| Fulcrum Construction | Feb 4, 2026 |
| Grasstains LLC | Feb 4, 2026 |
| JLA Public Involvement | Feb 5, 2026 |
| JM Renderworks | Feb 4, 2026 |
| Keystone Contracting, Inc. | Feb 5, 2026 |
| Kodiak Pacific Construction | Feb 4, 2026 |
| Nutter Corporation | Feb 5, 2026 |
| Pac Green Landscape | Feb 4, 2026 |
| Plan Center Northwest | Feb 4, 2026 |
| RA Gray Construction | Feb 5, 2026 |
| ROGER LANGELIERS CONSTRUCTION | Feb 5, 2026 |
| Salem Contractors Exchange | Feb 4, 2026 |
| The Saunders Company | Feb 4, 2026 |
| Tri-City Construction Council | Feb 4, 2026 |
About City of Tualatin, OR
With nearly 28,000 residents, the City of Tualatin is a dynamic, vibrant community conveniently located just 12 miles south of Portland and 30 miles north of Salem, the state capital. Situated at the intersection of Interstate highways 5 and 205, Tualatin is a short distance to adventure, from the Cascade Mountain Range to the Oregon Coast.
Share: