Tertiary Treatment Facility
| Project #: | 2023-WW06 (ITB) |
|---|---|
| Issued by: | Oak Lodge Water Services |
| Publish Date: | Oct 21, 2025 6:15PM |
| Bids Due Date: |
Dec 4, 2025 2:00PM
(Pacific Standard Time)
|
| Price Range: | $13,000,000 - $13,500,000 |
| Status: | Open |
Description
Demolition of an abandoned buried chlorine contact tank and construction of a Tertiary Treatment Facility in the resulting open site at the Wastewater Treatment Plant, located at 13750 SE Renton Ave, Milwaukie, OR, 97222.
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
| Item No | Item | Unit of Measure | Quantity | Cost | Required? |
|---|---|---|---|---|---|
| 2 | Pavement Repair Post-Construction | SF | 5000.00 |
|
|
| 3 | Lump Sum Bid Price | LS | 1.00 |
|
|
Attachments
This project has the following solicitation documents.
You will need to:
Be logged into Bid Locker
Be registered with Oak Lodge Water Services
Pre-Bid Site Visit Information
A mandatory pre-bid conference for the Project will be held on Wednesday, November 5, 2025 at 10:00 am local time at the Wastewater Treatment Plant, 13750 SE Renton Ave, Milwaukie, OR. Bids will not be accepted from Bidders that do not attend this pre-bid conference.
| Site Visit Date and Registration |
|---|
|
Nov 5, 2025 10:00AM
(Pacific Standard Time)
The registration cutoff for this pre-bid site visit is Nov 5, 2025 10:00AM. If you plan to attend this pre-bid site visit, you must register by this deadline. Before you can register your attendance, you will need to register your vendor profile with Oak Lodge Water Services using the "Register" button below. |
Pre-Bid Site Visit Registrant List |
Vendor Questions and Answers
Submitted Questions About This Bid
These are vendor questions for which the agency has supplied an answer.
| Questions | |
|---|---|
| Good Afternoon, Due to the high volume of public bids scheduled for submission between the 17th and 21st, we are unable to allocate adequate resources to prepare a complete bid for the Tertiary Treatment Facility project. We anticipate this situation may also affect other potential bidders, which could limit overall participation. To allow more contractors the opportunity to submit competitive bids, we respectfully request that the bid date be extended by approximately one and a half to two weeks. Please let us know if you have any questions or concerns. Thank you, |
Asked Oct 31, 2025 1:30PM
|
|
Answer:
Please see Addendum 1 for a response to this question. |
|
| Are Attachment A (AIS materials log) and Attachment B (BABA) due with the bid? Attachment Bs Form indicates "due with bid" and instructions 01 35 00 4.02 say Att A is due with bid. |
Asked Nov 5, 2025 8:52AM
|
|
Answer:
Please see Addendum 1 for a response to this question. |
|
| Article 3 - Qualifications of bidders (Section 02 20 00 instructions to bidders) does not coincide with the bid form checklist. Please clarify - for example: 3.01 A&B - Does the Qualifications Statement Form (00 45 10) cover requirements in 3.01 A & B? Also - 3.01 D - Is there a Form that captures whether the Bidder is a resident, or does a separate written statement need to be made? 3.01E - what is required for Subcontractor and Supplier 'qualification' information at time of bid? |
Asked Nov 5, 2025 9:09AM
|
|
Answer:
Please see Addendum 1 for a response to this question. |
|
| We have reviewed the bid forms/documents and have the following requests. Concerning the Qualifications Statement (00 45 10): 1. Article 4 – Safety – Remove requirement for subcontractor EMR, TRFR, MH with bid and have these due three days after bid by the apparent low bidder. 2. Article 5 – Financial – Remove the requirements for providing audited/current financial statements and the also the ratio calculations in the table. 3. Article 9 – Required Attachments A-I Have these due three days after bid by the apparent low contractor. And remove the requirement for the audited financial statements as requested above. |
Asked Nov 5, 2025 9:13AM
|
|
Answer:
Please see Addendum 1 for a response to this question. |
|
| DRAWING / SPEC SECTION: C-00-201 S-50-301 FACILITY / LOCATION: Site/Elevations COMMENT: Sheet S-50-301 shows top of curb elevation = 35.27 Sheet C-00-201 shows top of sidewalk elevation @ edge of bldg.= 35.79 Please clarify if the sidewalk is intended to be poured up on CMU. TYPE OF COMMENT (ISSUE/QUESTION/ VE/CONSTRUCTABILITY): Question |
Asked Nov 7, 2025 9:18AM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: 05 44 00, 2.02/A FACILITY / LOCATION: Steel Trusses COMMENT: This spec states "All truss steel shall be 54 mil thickness". Typically, we see 54 mil for the top chords only to provide adequate material for the attachment of the fasteners used to connect the roof deck to the trusses. We don’t need 54 mil on other members to get the trusses to engineer. Please clarify if the 54 mil can be used for top chords only as using 54 mil for all members is costly compared to 54 mil top chords only. TYPE OF COMMENT (ISSUE/QUESTION/ VE/CONSTRUCTABILITY): Question |
Asked Nov 7, 2025 9:19AM
|
|
Answer:
This question is addressed in Addendum 1. |
|
| DRAWING / SPEC SECTION: A-50-502, A-50-302, 04 26 13 FACILITY / LOCATION: Masonry Veneer System COMMENT: Drawings and specs have discrepancies. Please confirm if there is to be a 1" air space with 10" mortar deflector strips per A-50-302 and 04 26 13, OR full height cavity mat per 4/A-50- 502. TYPE OF COMMENT (ISSUE/QUESTION/ VE/CONSTRUCTABILITY): Question |
Asked Nov 7, 2025 9:21AM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: 04 22 00 FACILITY / LOCATION: CMU COMMENT: Concrete Unit Masonry spec, page 3, Part 2 Products, 2.01 Concrete Masonry Unit, B. is calling for Concrete Masonry Units shall contain Dry block or Rain block IWR additive, Typically this would be used in a colored CMU unit but not in a natural Gray CMU unit that is calling for paint per A-50-10 finish Schedule. Please confirm the Natural Gray Smoothface CMU’s for room 101 and 102 are not required to have Dryblock or Rainblock IWR. TYPE OF COMMENT (ISSUE/QUESTION/ VE/CONSTRUCTABILITY): Question |
Asked Nov 7, 2025 9:22AM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: A-50-302 FACILITY / LOCATION: Wall assembly COMMENT: Detail 1 on A-50-302 shows a through wall flashing extending through the structural CMU and veneer system, which is unusual. This detail also indicates a secondary structural curb that is not shown on structural drawings. Can this detail be cleaned up to clarify the intended assembly. TYPE OF COMMENT (ISSUE/QUESTION/ VE/CONSTRUCTABILITY): Clarification |
Asked Nov 7, 2025 9:22AM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION:SD-50-101 FACILITY / LOCATION: CCB Demo COMMENT: Please provide CCB Asbuilts. TYPE OF COMMENT (ISSUE/QUESTION/ VE/CONSTRUCTABILITY): Constructability |
Asked Nov 7, 2025 9:23AM
|
|
Answer:
This question is addressed in Addendum 1. |
|
| Regarding the Temporary Bypass Pumping: - What is the depth of the 36" SE piping? - What is the pressure (PSI) of the upstream connections? - Is there any elevation gain for the discharge lines to overcome while running to the bulkheads in the UV Disinfection Channels? |
Asked Nov 10, 2025 11:00AM
|
|
Answer:
This question is addressed in Addendum 1. |
|
| Can you provide specifications for the polished concrete? |
Asked Nov 11, 2025 5:02AM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| When is the mandatory pre-bid attendance going to be posted? |
Asked Nov 11, 2025 1:57PM
|
|
Answer:
Pre-bid attendance was included in Addendum 1. |
|
| DRAWING / SPEC SECTION: 01 12 18 FACILITY / LOCATION: 36" SE COMMENT: Spec section 01 12 16.1.04 states that the removal of existing 36" SE and final tie in of the new 36" TFI and TFE is to be scheduled during dry weather (typically May to October). Note 14 on CD-00-201 states the existing 36" SE pipe is to be replaced after the new Tertiary System is commisioned. The lead time for the new filters are approximately 26-28 weeks. This means the filters will not be on site until November (therefrore new Tertiary System TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Constructability |
Asked Nov 11, 2025 3:01PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| FACILITY / LOCATION: Civil COMMENT: BW in the pipe schedule for encased pipe is PVC-80. There is a detail that calls out for a Weep ring D13002. Will this detailed be inforced for PVC pipe? The detail states its for DIP. TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Constructability |
Asked Nov 11, 2025 3:02PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| FACILITY / LOCATION: Civil COMMENT: Detail D02002 and P11001 the floor drain and cleanout are called out on the PD line. The PD line is DIP in the pipe schedule. The detail looks like it is for Hubbed Cast Iron. Also, detail D02002 has a trap that appears to be cast iron hubbed. Will a trap be required on the PD line that is DIP? Or will there be a different material used for the trap, floor drain, and clean out connections. TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Constructability |
Asked Nov 11, 2025 3:03PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: C-00-401 FACILITY / LOCATION: Civil COMMENT: What are the piping Specs be for the 4" & 2" D? TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Constructability |
Asked Nov 11, 2025 3:04PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: C-00-401 FACILITY / LOCATION: Civil COMMENT: There is a 2"D that routes around the building. Note 9 calls out a JR Smith 1786 down spout that is 4" out let. Will we be connecting a 4" drain to discharge into a 2" pipe? TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Constructability |
Asked Nov 11, 2025 3:04PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: A-50-101 FACILITY / LOCATION: Architectural COMMENT: Room finish schedule does not specify the material type for the ceiling. Please clarify the intent. TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Question |
Asked Nov 11, 2025 3:05PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: A-50-101 FACILITY / LOCATION: Door Schedule COMMENT: Door 101A is scheduled to be Type B and have a 7'-0" tall door and a 9'-4" tall frame. Please confirm the intent is to be a type B1 door with transom. TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Question |
Asked Nov 11, 2025 3:06PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: A-50-101 FACILITY / LOCATION: Door Schedule COMMENT: Please clarify the transom material for the Door type B1. Door schedule calls for all doors and frames to be FRP. Detail 5 for door type B1 calls for an insulated metal removable transom. TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Question |
Asked Nov 11, 2025 3:07PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: A-50-101 FACILITY / LOCATION: Door Schedule COMMENT: Detail 4 for Door Type B notes that it is a hollow metal door and frame. Door schedule states FRP material for all doors and frames. Please clarify. TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Question |
Asked Nov 11, 2025 3:08PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| DRAWING / SPEC SECTION: 08 11 13 FACILITY / LOCATION: HM Doors COMMENT: There is a spec section calling for Hollow Metal Doors and Frames. However, this does not appear to apply to the current project. Please clarify if and where hollow metal doors should apply, or strike the specification. TYPE OF COMMENT (ISSUE/QUESTION/VE/CONSTRUCTABILITY): Question |
Asked Nov 11, 2025 3:09PM
|
|
Answer:
This question will be addressed in an upcoming addendum. |
|
| We respectfully request a two (2) week extension to the bid closing date for this project. We are requesting an extension for the purpose of preparing an exact estimation as per your requirements to make our best competitive offer. Thank you for your consideration. |
Asked Nov 12, 2025 11:47AM
|
|
Answer:
Per Addendum 1, a time extension has been granted until December 4, 2025. |
|
For Questions or Additional Information, Contact:
Name: Oak Lodge Water Services
Email: procurement@olws.org
Planholders
Planholders
These are the vendors who have downloaded the solicitation documents:
| Business | When |
|---|---|
| Abadan Plan Center |
Oct 27, 2025
(plan center)
|
| ABC Roofing, a Tecta America Company, LLC | Oct 30, 2025 |
| Allied Solutions | Oct 28, 2025 |
| Blackridge Research & consulti | Oct 24, 2025 |
| Braun Construction & Design, LLC | Oct 28, 2025 |
| ConstructConnect | Oct 28, 2025 |
| Correct Equipment | Oct 30, 2025 |
| DCN | Oct 27, 2025 |
| DJC Oregon Project Center | Oct 27, 2025 |
| Emery & Sons Construction Group, LLC |
Oct 27, 2025
(prime)
|
| Eugene Builders Exchange | Oct 24, 2025 |
| Ferguson | Oct 30, 2025 |
| Fulcrum Construction | Oct 27, 2025 |
| Goble Sampson |
Oct 28, 2025
(sub)
|
| Green Mountain Excavation LLC |
Nov 10, 2025
(sub)
|
| IES Communications | Nov 14, 2025 |
| Industrial Systems, Inc | Nov 18, 2025 |
| INLINE Commercial Construction | Oct 27, 2025 |
| James W. Fowler Co. |
Oct 27, 2025
(prime)
|
| Joseph Muller Construction | Nov 10, 2025 |
| Ken Leahy Construction |
Nov 7, 2025
(sub)
|
| Kerr Contractors Oregon, LLC |
Oct 28, 2025
(prime)
|
| Lake Oswego Insulation | Oct 27, 2025 |
| Landis & Landis Construction | Oct 31, 2025 |
| McClure and Sons, Inc. |
Oct 27, 2025
(prime)
|
| Mill Plain Electric, Inc. | Nov 5, 2025 |
| NorthStar Electrical |
Nov 17, 2025
(sub)
|
| Northwest Linings & Geotextile Products, Inc |
Nov 13, 2025
(sub)
|
| OCD Automation | Nov 17, 2025 |
| ORR Inc. |
Oct 28, 2025
(prime)
|
| Pacific Business Systems | Nov 4, 2025 |
| Plan Center Northwest |
Oct 24, 2025
(plan center)
|
| Premier Builders Exchange |
Oct 30, 2025
(plan center)
|
| QTO Solutions | Nov 13, 2025 |
| R.L. Reimers Company | Oct 24, 2025 |
| Rotschy, LLC. |
Oct 31, 2025
(prime)
|
| Salem Contractors Exchange |
Oct 24, 2025
(plan center)
|
| Seattle Daily Journal of Commerce | Oct 24, 2025 |
| Signature Paving Services, Inc. | Nov 1, 2025 |
| Slayden Constructors | Oct 27, 2025 |
| STELLAR J CORPORATION |
Oct 28, 2025
(prime)
|
| Tapani, Inc. | Nov 3, 2025 |
| Technical Systems, Inc. (TSI) |
Nov 3, 2025
(sub)
|
| Tice Electric Co | Nov 13, 2025 |
| Tri-City Construction Council |
Oct 24, 2025
(plan center)
|
| Truebeck Construction | Oct 27, 2025 |
| US West Electric | Nov 17, 2025 |
| West/Meyer Inc | Nov 3, 2025 |
| Western Oilfields Supply Company |
Nov 7, 2025
(sub)
|
| WESTERN OILFIELDS SUPPLY COMPANY | Nov 13, 2025 |
Solicitation Change History
Changes to This Listing:
| Change | |
|---|---|
| The bid due date has changed. The following bid documents were added: OLWS Tertiary Treatment Addendum 1 w Attachmts.pdf |
Nov 12, 2025 |
About Oak Lodge Water Services
Oak Lodge Water Services (OLWS) provides drinking water, wastewater, and watershed protection services to approximately 29,000 residents and businesses in Oak Grove, Jennings Lodge, and parts of Milwaukie and Gladstone.
Our system includes 208 miles of drinking water and wastewater pipes, 3,123 catch basins, and 773 fire hydrants. Additionally, we operate a wastewater treatment plant that processes over 1.5 billion gallons of wastewater each year.
Share:
| Your submitted questions |
|---|
