ITB for Dover North Utility Rehabilitation, CIP 8098B
Project #: | 3987-23 |
---|---|
Issued by: | City of Beaverton, OR |
Publish Date: | Mar 14, 2023 5:00PM |
Bids Due Date: |
Apr 6, 2023 2:00PM
(Pacific Daylight Time)
|
Status: | awardpending |
Award Notes: | Notice of Intent to Award to Interlaken, Inc. at the May 2, 2023, City Council Meeting. Posted 04/07/2023. |
Posted: | Mar 14, 2023 |
Description
The City of Beaverton is accepting will only accept electronic bids for the project, Dover North Utility Rehabilitation, CIP 8098B, Project No. 3987-23. The project consists of storm drainage improvements (installation of 1,600 lineal feet of 4-inch through 12-inch pipe, 10-inch and 12-inch CIPP lining, manholes, catch basins) and sanitary sewer improvements (installation of 190 lineal feet of 8-inch pipe, manholes, spot repairs, and 6-inch CIPP short liners). The project cost is approximately between $ 900,000 and $ 1,100,000.
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
Item No | Item | Unit of Measure | Quantity | Required? |
---|---|---|---|---|
A-1 | Mobilization | LS | 1.00 | |
A-2 | Traffic Control | LS | 1.00 | |
A-3 | Erosion Prevention & Sediment Control | LS | 1.00 | |
A-4 | Exploratory Excavation (including potholing) | CY | 50.00 | |
A-5 | Trench Foundation | CY | 30.00 | |
A-6 | Landscape Restoration | SF | 100.00 | |
B-1 | Asphalt Pavement Saw Cutting (quantity includes T-cut) | LF | 5000.00 | |
B-2 | CIPP Liner, 12-Inch | LF | 395.00 | |
B-3 | CIPP Liner, 10-Inch | LF | 224.00 | |
B-4 | Service Line Reconnection | EA | 11.00 | |
B-5 | 4-Inch, PVC D3034 Pipe, Granular Backfill | LF | 40.00 | |
B-6 | 4-Inch, PVC C900 Pipe, Granular Backfill | LF | 16.00 | |
B-7 | 4-Inch, Ductile Iron Pipe, Granular Backfill | LF | 10.00 | |
B-8 | 10-Inch, PVC D3034 Pipe, Granular Backfill | LF | 93.00 | |
B-9 | 10-Inch, PVC C900 Pipe, Granular Backfill | LF | 144.00 | |
B-10 | 10-Inch, Ductile Iron Pipe, Granular Backfill | LF | 6.00 | |
B-11 | 12-Inch, PVC D3034 Pipe, Native Backfill | LF | 105.00 | |
B-12 | 12-Inch, PVC D3034 Pipe, Granular Backfill | LF | 870.00 | |
B-13 | 12-Inch, PVC C900 Pipe, Granular Backfill | LF | 382.00 | |
B-14 | Spot Repair on Storm Pipe, 5 ft. Depth (Dover Ln. North STA 8+27 & STA 9+05) | EA | 2.00 | |
B-15 | Core Drill and Connect to existing structure with sand collar (Sheet SD-13) | EA | 1.00 | |
B-16 | Shallow Cone Concrete Manhole (48-in), < 6' Depth (SDMH-01, 02) | EA | 2.00 | |
B-17 | Standard Concrete Manhole (48-in), < 6' Depth (SDMH-08, 12) | EA | 2.00 | |
B-18 | Standard Concrete Manhole (48-in), 6' - 10' Depth (SDMH-03, 04, 05, 06, 07, 09, 11, 13) | EA | 7.00 | |
B-19 | Concrete Inlet, Type Curb Inlet Catch Basin, < 6' Depth (CI-01, 02, 04) | EA | 3.00 | |
B-20 | Concrete Inlet, Type Curb Inlet Catch Basin, 6' - 8' Depth (CI-03, 05, 06, 07) | EA | 4.00 | |
B-21 | Catch Basin, Type II Area Drain, < 6' Depth (AD-02, 03, 04, 05, 06, 07) | EA | 6.00 | |
B-22 | Catch Basin, Type II Area Drain, 6' - 8' Depth (AD-01) | EA | 1.00 | |
B-23 | Catch Basin, Type CG-2, < 6' Depth (CB-04) | EA | 1.00 | |
B-24 | Catch Basin, Type CG-2, 6' - 8' Depth (CB-01, 02, 03) | EA | 3.00 | |
B-25 | Extra for MH over Existing Sewers (SDMH-01) | EA | 1.00 | |
B-26 | Filling Abandoned Structures | EA | 6.00 | |
B-27 | Abandoning Pipe in Place (Comply w/ 00490.43) | LF | 656.00 | |
B-28 | Trench Resurfacing, Level 3, 1/2-inch Dense Grade HMAC, 4-Inch Depth | SY | 1600.00 | |
B-29 | Temporary Trench Resurfacing, 2-Inch Depth HMAC | SY | 200.00 | |
B-30 | Remove and Replace concrete driveway (5110 SW Dover Ln) | SF | 1050.00 | |
B-31 | Remove and Replace driveway drain (5110 SW Dover Ln) | EA | 1.00 | |
B-32 | Landscaping, Fill, & Plantings on (5030 SW Oleson Rd. & 5110 SW Dover Ln) | LS | 1.00 | |
B-33 | Install Concrete Curb & Gutter (ex. curb removal is incidental) | LF | 115.00 | |
B-34 | Remove & Replace Concrete Walk | SF | 135.00 | |
B-35 | Remove and Reinstall Existing Mailbox Post (5145 SW Dover Ln) | LS | 1.00 | |
B-36 | Remove old and install new fence and gate (5110 SW Dover Ln) | LF | 30.00 | |
B-37 | Strip Existing Ground, 6-Inches Thick (00320) | SF | 1970.00 | |
B-38 | Topsoil, 8-Inches Thick (00330) | SF | 1970.00 | |
B-39 | Embankment in Place (00330) | CY | 61.00 | |
B-40 | Major adjustment of Area Drain | EA | 1.00 | |
C-1 | Removal of Asbestos Concrete Pipe | LF | 35.00 | |
C-2 | CIPP Short Liner, 6-Inch | EA | 4.00 | |
C-3 | Service Line Reconnection | EA | 1.00 | |
C-4 | Robotically Trim Obstruction | EA | 3.00 | |
C-5 | Spot Repair on Transite Sewer Pipe, 6 ft. Depth (SS-02) | EA | 1.00 | |
C-6 | Spot Repair on Transite Sewer Pipe, 12 ft. Depth (SS-04 & 05) | EA | 4.00 | |
C-7 | Standard Concrete Manhole (48-in), 6' Depth (SSMH-01) | EA | 1.00 | |
C-8 | Standard Concrete Manhole (48-in), 11' Depth (SSMH-02) | EA | 1.00 | |
D-1 | Mobilization | LS | 1.00 | |
D-2 | Traffic Control | LS | 1.00 | |
D-3 | Erosion Prevention & Sediment Control | LS | 1.00 | |
D-4 | Asphalt Pavement Saw Cutting (quantity includes T-cut) | LF | 800.00 | |
D-5 | Connect to existing structure w/ sand collar (includes core drill) | EA | 2.00 | |
D-6 | 8-Inch, PVC D3034 Pipe, Granular Backfill (includes removing ex. 6") | LF | 196.00 | |
D-7 | Manufactured Tee | EA | 8.00 | |
D-8 | Trench Resurfacing, 11-Inch Depth | SY | 108.00 | |
D-9 | Longitudinal Pavement Markings - 4" Wide Skip Stripe (MMA) | LF | 60.00 |
Attachments
This project has the following solicitation documents.
Pre-Bid Conference
NON-MANDATORY PRE-BID CONFERENCE. A Non-Mandatory pre-bid conference for this project will be held by conference call using Zoom on 3/22/2023 at 10:00 AM.
https://www.zoomgov.com/my/beavertonprocurement
Pre-Bid Conference Date |
Mar 22, 2023 10:00AM
(Pacific Daylight Time)
|
Vendor Questions and Answers
Submitted Questions about this Bid
There are currently no questions that have been answered by City of Beaverton, OR.
The Question and Answer Period is currently closed.
When the question and answer period is open, vendors may submit their questions on this solicitation to be answered by City of Beaverton, OR.
For Questions or Additional Information, Contact:
Name: Michael Phillips
Email: bidmail@BeavertonOregon.gov
Solicitation Change History
Changes to This Listing:
Change | |
---|---|
The following bid documents were added: ADDENDUM 1.pdf ADDENDUM 1 - Plan Sheets.pdf |
Mar 21, 2023 |
The following bid documents were added: ADDENDUM 2.pdf |
Mar 28, 2023 |