Construction of ADA Curb Ramp Retrofit Upgrade Project
Project #: | 3982-23 |
---|---|
Issued by: | City of Beaverton, OR |
Publish Date: | Feb 1, 2023 8:00PM |
Bids Due Date: |
Mar 7, 2023 2:00PM
(Pacific Standard Time)
|
Status: | No award issued |
Award Notes: | Hello All, Please see the cancellation notice for this ITB and the reasoning included therein. The City of Beaverton appreciates your time and will be re-bidding this project shortly. Thank you. |
Posted: | Feb 1, 2023 |
Description
The City of Beaverton is accepting will only accept electronic bids for the project, CONSTRUCTION OF ADA CURB RAMP RETROFIT UPGRADE PROJECT., Project No. 3982-23. It is the City’s intent to enter into one-year contract with the option to renew for additional one-year term with the total term not to exceed two years. Year one project consists of removal of 2,175 feet of curb, removal of 1,091.3 square yards of walk and driveways, 505 square yards of 4” asphalt pavement repairs approximately requiring 96 tons of asphalt, placing 2,175 feet of curb and gutter, placing 9,826 square feet of monolithic curb and sidewalk and approximately 110 tons of aggregate. The project cost is approximately between $900,000.00 and $1,000,000.00. Year two project consists of 1677 feet of curb, removal of 1,185 square yards of walk and driveways, 439 square yards of 4” asphalt pavement repairs approximately requiring 84 tons of asphalt, placing 1,183 feet of curb and gutter, placing 12,412 square feet of monolithic curb and sidewalk and approximately 132 tons of aggregate. The project cost is approximately between $900,000.00 and $1,000,000.00. Both projects are on-site design-build with no plans for ADA curb ramps design.
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
Item No | Item | Unit of Measure | Quantity | Required? |
---|---|---|---|---|
TEMPORARY FEATURES AND APPURTENANCES | ||||
1 | Mobilization | LS | 1.00 | |
2 | Temp. Work Zone Traffic Control, Complete | LS | 1.00 | |
3 | Erosion Control | LS | 1.00 | |
4 | Inlet Protection | EA | 35.00 | |
5 | Pollution Control Plan | LS | 1.00 | |
ROADWORK | ||||
6 | Removal of Curb | FT | 2175.00 | |
7 | Removal of Walks & Driveways | SY | 1091.30 | |
8 | Asphalt Pavement Saw Cutting | FT | 2489.00 | |
9 | Clearing and Grubbing | LS | 1.00 | |
DRAINAGE AND SEWERS | ||||
10 | 3 Inch, PVC Pipe, (Weep Holes) | FT | 46.00 | |
11 | 4 Inch Asphalt Concrete Pavement Repairs | SY | 505.30 | |
12 | Concrete Curb, Curb and Gutter | FT | 2175.00 | |
13 | Monolithic Curb and Sidewalk | SF | 9825.50 | |
14 | Truncated Dome on New Surface | SF | 1130.00 | |
PERMANENT TRAFFIC CONTROL AND ILLUMINATIN SYSTEM | ||||
15 | Remove and Reinstall Existing Signs | LS | 1.00 | |
RIGHT OF WAY DEVELOPMENT AND CONTROL | ||||
16 | Single Mailbox Support | EA | 6.00 | |
17 | Reinstall USPS Cluster Mailbox | EA | 2.00 | |
WATER SUPPY SYSTEM | ||||
18 | Relocate Irrigation System | LS | 1.00 | |
TEMPORARY FEATURES AND APPURTENANCES | ||||
1 | Mobilization | LS | 1.00 | |
2 | Temp. Work Zone Traffic Control, Complete | LS | 1.00 | |
3 | Erosion Control | LS | 1.00 | |
4 | Inlet Protection | EA | 18.00 | |
5 | Pollution Control Plan | LS | 1.00 | |
ROADWORK | ||||
6 | Removal of Curb | FT | 1677.00 | |
7 | Removal of Walks and Driveways | SY | 1185.40 | |
8 | Asphalt Pavement Saw Cutting | FT | 2164.50 | |
9 | Clearing and Grubbing | LS | 1.00 | |
DRAINAGE AND SEWERS | ||||
10 | 3 Inch, PVC Pipe, (Weep Holes) | FT | 8.00 | |
WEARING SURFACES | ||||
11 | 4 Inch Asphalt Concrete Pavement Repairs | SY | 439.20 | |
12 | Concrete Curb, Curb | FT | 82.50 | |
13 | Concrete Curb, Curb and Gutter | FT | 1183.20 | |
14 | Monolithic Curb and Sidewalk | SF | 12412.20 | |
15 | Truncated Dome on New Surface | SF | 736.00 | |
PERMANENT TRAFFIC CONTROL AND ILLUMINATIN SYSTEM | ||||
16 | Remove and Reinstall Existing Signs | LS | 1.00 | |
RIGHT OF WAY DEVELOPMENT AND CONTROL | ||||
17 | Single Mailbox Support | EA | 1.00 | |
18 | Reinstall USPS Cluster Mailbox | EA | 1.00 | |
WATER SUPPY SYSTEM | ||||
19 | Relocate Irrigation System | LS | 1.00 |
Attachments
This project has the following solicitation documents.
Pre-Bid Conference
. A Non-Mandatory pre-bid conference for this project will be held by conference call using Zoom on 2/24/2023 at 10:00 AM.
Pre-Bid Conference Date |
Feb 24, 2023 10:00AM
(Pacific Standard Time)
|
Vendor Questions and Answers
Submitted Questions About This Bid
These are vendor questions for which the agency has supplied an answer.
Questions | |
---|---|
the bidders instructions say "onsite design build" does this mean that the ramps can be field fit and we will not have to submit stamped drawings to the city for approval. |
Asked Feb 14, 2023 1:14PM
|
Answer:
Yes, you do not have to submit a stamped drawing. Everything is a field fit sidewalk and ramp.
|
For Questions or Additional Information, Contact:
Name: Michael Phillips
Email: bidmail@BeavertonOregon.gov
Solicitation Change History
Changes to This Listing:
Change | |
---|---|
The bid due date has changed. |
Mar 3, 2023 |
Share:
Your submitted questions |
---|