ITB 4065 Renovations at RID Patrol Facility
Project #: | ITB 4065 (ITB) |
---|---|
Issued by: | Oregon Metro |
Bids Due Date: |
Jul 27, 2022 2:00PM
(Pacific Standard Time)
|
Status: | awarded |
Posted: | Jul 1, 2022 |
Description
Bids must be enclosed in a sealed envelope and mailed or delivered to, Metro, 600 NE Grand, Portland, Oregon 97232-2736, Attention: Kim Paul, ITB 4065. All bids must be received no later than the date and time indicated on the ITB cover page, and will be publicly opened and read at that time. First Tier Subcontractor and Subcontractor Equity forms are due from all bidders within two (2) hours of the bid closing time or the bid will be considered non-responsive. A bid may not be submitted by facsimile (FAX) transmittal or electronically by email.
Contractor shall perform renovations at Metro’s Regional Illegal Dumping (RID) Patrol facility located at 1630 SE 8th Avenue, Portland OR 97214. Contractor will perform work according to the design and specifications provided in the ITB for flooring removal and installation of flooring, paint, ceiling repair and removal of select walls to open up work spaces.
Please see attached ITB for details.
Attachments
This project has the following solicitation documents.
You will need to:
- Be logged into Bid Locker
- Be registered with Oregon Metro
- Express interest using the "Express Interest" button above
Pre-Bid Conference
A voluntary Pre-Bid Conference is scheduled for all potential prime and sub-contractors on July 7th, 2022, at 1:00 pm at the RID Patrol Facility located at 1630 SE 8th Ave, Portland OR 97214. Participants shall wear a mask while inside the building. Per Metro’s Subcontractor Equity Program, Contractors that submit a bid for this project must solicit a sub-bid from ALL COBID certified businesses who attend the pre-bid conference.
Pre-Bid Conference Date |
Jul 7, 2022 1:00PM
(Pacific Standard Time)
|
Vendor Questions and Answers
For Questions or Additional Information, Contact:
Please submit questions to bidsandproposals@oregonmetro.gov.
Planholders
Planholders
These are the vendors who have downloaded the solicitation documents:
Business | Contact Phone | When |
---|---|---|
3 Diamond Construction, LLC | 15037346323 | Jul 20, 2022 |
Abadan Plan Center | 509-747-2964 | Jul 15, 2022 |
Art Cortez Construction Inc | 503-647-7697 | Jul 8, 2022 |
Asa Construction (WBE/DBE) | 503-913-3383 | Jul 15, 2022 |
ASA Construction LLC | 5039133383 | Jul 5, 2022 |
Buildskape | 5033516126 | Jul 6, 2022 |
CMH Remodeling LLC (CCB, ESB, MDI) | 5033623792 | Jul 22, 2022 |
ConstructConnect | (323) 602-5079 | Jul 4, 2022 |
Dodge Data & Analytics | 4139304513 | Jul 22, 2022 |
Eugene Builders Exchange | 541-484-5331 | Jul 6, 2022 |
Fulcrum Construction (WBE, ESB ) | 503-644-6351 | Jul 13, 2022 |
IMS | 8584908800 | Jul 5, 2022 |
INLINE Commercial Construction (MBE) | 5036425117 | Jul 7, 2022 |
Minority Construction Group LLC (OMWBE) | 5039395094 | Jul 22, 2022 |
Plan Center Northwest | 503-650-0148 | Jul 5, 2022 |
prospice llc | 480-326-9219 | Jul 7, 2022 |
Pwxpress | 4086768941 | Jul 20, 2022 |
Ross Builders Northwest | 5039495292 | Jul 5, 2022 |
Salem Contractors Exchange | 503-362-7957 | Jul 5, 2022 |
Seattle Daily Journal of Commerce | 2066228272 | Jul 6, 2022 |
Spokane Regional Plan Center | 509-328-9600 | Jul 7, 2022 |
Swinerton | (503) 224-6888 | Jul 6, 2022 |
Tri-City Construction Council | 509-582-7424 | Jul 5, 2022 |
Commodity Codes and Solicitation Change History
Commodity Codes (NIGP):
- 909-00
- BUILDING CONSTRUCTION SERVICES, NEW, INCLUDING MAINTENANCE AND REPAIR SERVICES
- 909-21
- Building Construction, Industrial, Warehouse, Etc.
- 909-22
- Building Construction, Non-Residential, Office Bldg., Etc.
- 909-30
- Building Construction, (Not Otherwise Classified)
- 909-31
- Building Construction, Sustainable, Green
- 914-00
- CONSTRUCTION SERVICES, TRADES, NEW CONSTRUCTION
Changes to This Listing:
Change | |
---|---|
The solicitation description has changed. The following bid documents were added: ITB 4065 Walkthrough Attendance.pdf |
Jul 15, 2022 |
The following bid documents were added: ITB 4066 Addendum One.pdf |
Jul 15, 2022 |
The bid due date has changed. |
Jul 15, 2022 |
Share:
Your submitted questions |
---|