Description
Metro is inviting bids to repair concrete slab and the electrical vault at the loading dock at the Oregon Convention Center.
Per the solicitation documents, the selected contractor will provide all equipment, labor and materials necessary to remove 8000 sq ft of topping slab contract above post tension slab, remove waterproof membrane, reinstall new membrane, drainage and concrete slab. This repair is above and part of the electrical vault directly below the area.
Special Instructions
Hard copies of bids are due at the time and place indicated in the solicitation document.
Attachments
This project has the following solicitation documents.
You will need to:
Be logged into Bid Locker
Be registered with Oregon Metro
Express interest using the "Express Interest" button above
Pre-Bid Conference Information
A VOLUNTARY Pre-Bid Conference is scheduled for all potential prime and sub-contractors on April 27, 2022 at 8:00 am at Oregon Convention Center Holliday Entrance, located at NE Holladay St. and 2nd Ave, Portland OR 97232. Per Metro’s Subcontractor Equity Program, Contractors that submit a bid for this project must solicit a sub-bid from ALL COBID certified businesses who attend the pre-bid conference.
Conference Date |
---|
Apr 27, 2022 8:00AM
(Pacific Standard Time)
Before you can register your attendance, you will need to register your vendor profile with Oregon Metro using the "Register" button below. |
Vendor Questions and Answers
For Questions or Additional Information, Contact:
Name: Bids and Proposals
Email: bidsandproposals@oregonmetro.gov
Planholders
Planholders
These are the vendors who have downloaded the solicitation documents:
Business | Contact Phone | When |
---|---|---|
Buildskape | 5033516126 | Apr 18, 2022 |
ConstructConnect | (323) 602-5079 | Apr 19, 2022 |
DJC Oregon Project Center | 503-274-0624 | Apr 21, 2022 |
Eugene Builders Exchange | 541-484-5331 | Apr 21, 2022 |
IMS | 8584908800 | Apr 15, 2022 |
Minority Construction Group LLC (OMWBE) | 5039395094 | May 5, 2022 |
Pioneer Waterproofing Company | 5032329020 | May 16, 2022 |
Plan Center Northwest | 503-650-0148 | Apr 18, 2022 |
PRT Construction Llc (ESB) | 5037805588 | May 3, 2022 |
Pullman SST, Inc | 7077453800 | Apr 25, 2022 |
Salem Contractors Exchange | 503-362-7957 | May 9, 2022 |
Seattle Daily Journal of Commerce | 2066228272 | Apr 15, 2022 |
Spokane Regional Plan Center | 509-328-9600 | Apr 26, 2022 |
Stellar J Corporation | 3606007339 | Apr 19, 2022 |
Tri-City Construction Council | 509-582-7424 | Apr 15, 2022 |
Commodity Codes and Solicitation Change History
Commodity Codes (NIGP):
- 909-24
- Building Construction, Commercial And Institutional
- 912-23
- Construction, General: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.
- 913-36
- Construction, Parking Lot And Alley
- 913-47
- Construction, Sidewalk And Driveway, Including Pedestrian And Handicap Ramps
- 913-56
- Construction, Utility And Underground Projects
- 913-62
- Construction, Concrete, Pour-In-Place, Form, Place, Finish
Changes to This Listing:
Change | |
---|---|
The following bid documents were added: ITB 4040 Addendum 1.pdf |
May 4, 2022 |
Share:
Your submitted questions |
---|