Florence Lane Reservoir Coating
Solicitation Type: | ITB |
---|---|
Issued by: | Tualatin Valley Water District |
Publish Date: | Apr 15, 2022 12:00AM |
Bids Due Date: |
May 10, 2022 2:00PM
(Pacific Standard Time)
|
Status: | noaward |
Posted: | Apr 11, 2022 |
Description
Sealed Bids for the construction of the Florence Lane Reservoir Coating (Project) for Tualatin Valley Water District (Owner) will be electronically accepted by Heather Speight, Procurement and Contract Administrator, via Equity Hub’s Bid Locker at https://bidlocker.us/details/2856_Florence_Lane_ Reservoir_Coating (Bid Locker) until 2:00 p.m. Local Time, on May 10, 2022 (Bid Closing Time). Bidders must sign up with Bid Locker at https://bidlocker.us/Home/bidlockerus before submitting a bid. There is no cost to register. Any bids received after the Bid Closing Time will not be considered.
Bids received by the Bid Closing Time will be publicly opened and read aloud immediately thereafter on a conference call at 971.300.4841, conference ID 313 869 577#.
Bidders are required to submit a First Tier Subcontractor Disclosure Form (First Tiers), as described by ORS 279C.370. The First Tiers must be submitted to Bid Locker within two hours of the Bid Closing Time. The Owner must reject a bid if the Bidder fails to submit the First Tiers by the deadline. Original copies of the Bid Security must be submitted to Owner within five business days of the Bid Closing Time as prescribed in Section 00 21 13.
The proposed work contemplated for the Project consists of furnishing required labor, equipment, and materials for construction of the following:
· Exterior re-coating of the top of the steel 2.1 and 1.9 MG potable water tanks. The coating system shall be an initial epoxy coat, epoxy intermediate overcoat, and a urethane topcoat.
· Light pressure washing of all sides of the water tanks.
· Cleaning and disinfecting the reservoirs.
All work is to be completed (Substantial Completion) within 90 calendar days of the Notice to Proceed. Anticipated Notice to Proceed date is June 2, 2022 or 10 days from the end of the protest period, whichever comes later.
Bid Documents may be obtained electronically either from Bid Locker or in electronic or hard copy format by contacting:
Contractor Plan Center, Inc.
5468 SE International Drive
Milwaukie, OR 97222
Phone: (503) 650-0148
E-mail: megan@contractorplancenter.com
Bidders will be notified via email when addenda are published. All addenda will be published on Bid Locker.
Bidders are responsible for the cost of obtaining the Bid Documents. The Bidder, including subcontractors, will also be responsible for signing a confidentiality agreement prior to obtaining the documents. Return of the documents is not required, and the amount paid for the Bid Documents is nonrefundable.
There will be a mandatory pre-bid conference for this Project. The pre-bid conference will be held at the Project site at 6675 SW Florence Lane, Portland, Oregon on April 28, 2022 at 2:00 p.m. local time.
Contractors must be pre-qualified in order to submit bids on this Project. Contractors that have a QP-1 rating with SSPC are deemed pre-qualified to bid. Firms that are not QP-1 rated must meet the following requirements:
· A minimum of five years of experience.
· Contractor must have performed this type of work and submit a minimum of three references including contact names and phone numbers.
Contractors must be qualified in accordance with the applicable parts of ORS 279 to enter into a contract with the Owner for public work in Oregon. Bidders are required to complete and submit with their bid Section 00 45 13, “Statement of Bidder’s Qualifications.” The Owner will investigate and determine if the qualifications of the apparent low bidder meet the minimum requirements as part of its evaluation of the lowest responsive and responsible bid.
No bid will be received or considered by the Owner unless the bid form contains, or is accompanied by, a statement by the bidder as a part of the bid that the provisions required by ORS 279C.800 through 279C.870 pertaining to prevailing wages are included in this Contract. Contractor licensing under ORS 468A.720 for asbestos abatement is not a requirement of this project. Each bid must contain a statement as to whether the bidder is a resident bidder as defined in ORS 279A.120. Each bid must contain a statement as to whether the bidder is registered with the Oregon Construction Contractors Board in accordance with the provisions of ORS 279C.365.
Bids must be submitted on the prescribed forms and must be accompanied by a certified check or bid bond executed in favor of the Tualatin Valley Water District in an amount not less than 10 percent of the amount bid. The successful bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract as prescribed in the Contract Documents.
The Owner reserves the right to reject all bids not in compliance with all prescribed public contracting procedures and requirements, including bidder responsibility under ORS 279C.375(3)(b), and may reject for good cause all bids upon the Owner’s finding that it is in the Owner’s or the public’s best interest to do so. The Owner reserves the right to waive informalities and to award a Contract to the qualified lowest responsive and responsible bidder.
For more information regarding this project contact Zach Lemberg, Engineering Associate with Tualatin Valley Water District at zach.lemberg@tvwd.org.
Published April 18, 2022
Special Instructions
Contractors must be pre-qualified in order to submit bids on this Project. Contractors that have a QP-1 rating with SSPC are deemed pre-qualified to bid. Firms that are not QP-1 rated must meet the following requirements:
• A minimum of five years of experience.
• Contractor must have performed this type of work and submit a minimum of three references including contact names and phone numbers.
Contractors must be qualified in accordance with the applicable parts of ORS 279 to enter into a contract with the Owner for public work in Oregon. Bidders are required to complete and submit with their bid Section 00 45 13, “Statement of Bidder’s Qualifications.” The Owner will investigate and determine if the qualifications of the apparent low bidder meet
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
Item | Unit of Measure | Quantity | Required? |
---|---|---|---|
1. Mobilization (Maximum 5% of Bid Total) | Lump Sum | 1.00 | |
2. Health and Safety | Lump Sum | 1.00 | |
3. Exterior Coating System | Lump Sum | 1.00 | |
4. Reservoir Cleaning and Disinfection | Lump Sum | 1.00 |
Attachments
This project has the following solicitation documents.
You will need to:
- Be logged into Bid Locker
- Be registered with Tualatin Valley Water District
Pre-Bid Conference
There will be a mandatory pre-bid conference for this Project. The pre-bid conference will be held at the Project site at 6675 SW Florence Lane, Portland, Oregon on April 28, 2022 at 2:00 p.m. local time.
Pre-Bid Conference Date |
Apr 28, 2022 2:00PM
(Pacific Standard Time)
|
Pre-Bid Conference Registration |
Before you can register your attendance, you will need to register your vendor profile with Tualatin Valley Water District using the "Register" button below. |
Vendor Questions and Answers
Submitted Questions About This Bid
There are no questions that have been answered and posted by Tualatin Valley Water District.
For Questions or Additional Information, Contact:
Name: Heather Speight
Email: bidsandproposals@tvwd.org
Planholders
Planholders
These are the vendors who have downloaded the solicitation documents:
Business | When |
---|---|
F.D. Thomas, Inc. | Apr 20, 2022 |
HCI INDUSTRIAL & MARINE COATINGS INC. | Apr 18, 2022 |
HCI Industrial & Marine coatings, Inc. | May 3, 2022 |
Long Painting Company | Apr 19, 2022 |
North Industrial, LLC. | Apr 19, 2022 |
Pittsburg Tank & Tower Maintenance Co., Inc. | Apr 20, 2022 |
Purcell Painting & Coatings | May 9, 2022 |
Seattle Daily Journal of Commerce | Apr 18, 2022 |
Solicitation Change History
Changes to This Listing:
Change | |
---|---|
The following bid documents were added: Florence Lane Reservoir Coating Addendum 1.pdf |
May 2, 2022 |
The bid due date has changed. The following bid documents were added: Florence Lane Reservoir Coating Addendum 2.pdf |
May 3, 2022 |
About Tualatin Valley Water District
Contracting with TVWD
TVWD is a special district, established to provide drinking water, and is governed by an elected Board of Commissioners. Because some of the information in our solicitations is confidential and protected under US law, all vendors are required to complete a Confidentiality Agreement prior to their TVWD Bid Locker profile being approved. This approval is a manual process. Please allow one business day for approval and follow any emailed instructions received. TVWD is not responsible for vendors who cannot download and/or submit solicitation responses due to vendor profiles that are not approved.
Public agencies with questions about a solicitation should call 503.848.3055 or email bidsandproposals@tvwd.org for information. Vendors who reach out directly will be redirected to the instructions in the specific solicitation or other emailed instructions.
Share:
Your submitted questions |
---|