Project #: RFQ 4047 (ITB)
Issued by: Oregon Metro
Bids Due Date: Jun 30, 2022 2:00PM (Pacific Daylight Time) add to calendar
Status: noaward
Award Notes: This solicitation has been cancelled.
Posted: Jun 9, 2022

Description

Removal of existing trail:

·         Removal of existing damaged asphalt trail section.

·         Removal will consist of removal and disposal of duff and top organic layers down to mineral soil and backfill should be applied in 6 inch lifts and compacted until no visual displacement.

·         Complete any root trimming necessary in the area and install root barrier to reduce future root encroachment. 

 

Installation of new trail section will be consistent with option 1 in attached drawings that include:

·         Raised timber side rails that are secured with re-bar that are ½’’ thickness x 18’’ minimum depth. 

·         Timbers for this should be 6’’x6’’ pressure treated lumber or an approved alternative with a 6 foot tread width.

·         Base layer material should be a minimum of a  4’’ layer of ¾’’ minus gravel topped with a 2’’ compacted ¼’’ minus gravel with fines  .  

·         Outslope should be 2% minimum 3% maximum.  



Attachments

This project has the following solicitation documents.

Bid Document File Size Notes
207,052
166,154
791,244
405,878
101,865 Award Document
152,923 Award Document

You will need to:

  • Unchecked Be logged into Bid Locker
  • Unchecked Be registered with Oregon Metro
  • Unchecked Express interest using the "Express Interest" button above

Vendor Questions and Answers

For Questions or Additional Information, Contact:

Please contact bidsandproposals@oregonmetro.gov with questions. Questions are due by June 23, 2022, at 2:00 p.m.

Planholders

Planholders

These are the vendors who have downloaded the solicitation documents:

Business Contact Phone When
Anderson Environmental Contracting, LLC (SDVOSB) 3605779194 Jun 14, 2022
ASA Construction LLC 5039133383 Jun 9, 2022
BEC Treestone Construction llc. 5038754310 Jun 16, 2022
ConstructConnect (323) 602-5079 Jun 13, 2022
Construction Bid Source 888-786-9450 Jun 14, 2022
Eugene Builders Exchange 541-484-5331 Jun 14, 2022
Plan Center Northwest 503-650-0148 Jun 10, 2022
Salem Contractors Exchange 503-362-7957 Jun 9, 2022
Seattle Daily Journal of Commerce 2066228272 Jun 9, 2022
Spokane Regional Plan Center 509-328-9600 Jun 15, 2022
Tapani, Inc. 360-687-1148 Jun 15, 2022
Tri-City Construction Council 509-582-7424 Jun 9, 2022
Twin Oaks Trails LLC 503-757-3762 Jun 27, 2022

Commodity Codes and Solicitation Change History

Commodity Codes (NIGP):

912-26
Construction, Hike And Bike Trail
912-52
Maintenance And Repair, Hike And Bike Trails
951-07
Facilities And Other Improvements, Drives, Parking Lots, Paths, Trails

Changes to This Listing:

Change
The following bid documents were added:
RFQ 4047 Addendum One 06222022.pdf
Jun 22, 2022

Share: