SW Wilson Ct (Kimberly – Hart) Waterline Replacement
Project #: | 3980-23 |
---|---|
Issued by: | City of Beaverton, OR |
Publish Date: | Jan 24, 2023 8:00AM |
Bids Due Date: |
Feb 14, 2023 2:00PM
(Pacific Standard Time)
|
Status: | Awarded |
Award Notes: | Notice of Intent to Award to Trench Line Excavation, Inc. of Corvallis, OR at the March 21, 2023, City Council Meeting. Posted February 14, 2023 |
Posted: | Jan 19, 2023 |
Description
The City of Beaverton is accepting will only accept electronic bids for the project, SW Wilson Ct (Kimberly – Hart) Waterline Replacement, Project No. 3980-23. The project consists of the installation of approximately 737 lineal feet of 6” diameter, 521 lineal feet of 8” diameter, and 400 lineal feet of 12” diameter new water main, with 33 water services, 3 hydrants, 1 CARV, and associated valves and structures. The project cost is approximately between $1,000,000 and $1,300,000.
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
Item No | Item | Unit of Measure | Quantity | Required? |
---|---|---|---|---|
A-1 | Mobilization / De-Mobilization | LS | 1.00 | |
A-2 | Temporary Work Zone Traffic Control, Complete (includes traffic control for connections to the existing system) | LS | 1.00 | |
A-3 | Erosion Control | LS | 1.00 | |
A-4 | Sawcut | LF | 7950.00 | |
A-5 | Exploratory Excavation (including potholing as needed) | CY | 45.00 | |
A-6 | Trench Resurfacing, Temporary (2” thick) | SY | 530.00 | |
A-7 | Trench Resurfacing, Permanent (6" thick), T-Cut Per COB Detail 300 | SY | 900.00 | |
A-8 | Remove & Replace Concrete Curb & Gutter | LF | 70.00 | |
A-9 | Remove & Replace Concrete Curb, Type-A | LF | 60.00 | |
A-10 | Remove & Replace Concrete Walk | SF | 100.00 | |
A-11 | Remove & Replace Concrete Pedestrian Crosswalk and Scoring | SF | 50.00 | |
A-12 | Replace Pavement and Longitudinal Pavement Markings, Thermoplastic | LS | 1.00 | |
A-13 | Replace Asphalt Speed Table & Traffic Markings - Thermoplastic, White | EA | 1.00 | |
A-14 | Landscape Restoration | LS | 1.00 | |
A-15 | Removing & Rebuilding Fence | LF | 20.00 | |
B-1 | 6" Ductile Iron Potable Water, Zinc Coated Pipe w/ Poly Wrap Encasement, Zinc Coated Fittings & Couplings w/ Restrained Joints, Class B Backfill | LF | 737.00 | |
B-2 | 8" Ductile Iron Potable Water, Zinc Coated Pipe w/ Poly Wrap Encasement, Zinc Coated Fittings & Couplings w/ Restrained Joints, Class B Backfill | LF | 521.00 | |
B-3 | 12" Ductile Iron Potable Water, Zinc Coated Pipe w/ Poly Wrap Encasement, Zinc Coated Fittings & Couplings w/ Restrained Joints, Class B Backfill | LF | 400.00 | |
B-4 | 2” Blowoff Assembly (temporary) | EA | 6.00 | |
B-5 | Chlorination Tap (temporary) | EA | 3.00 | |
B-6 | Connection to Existing 6” Water Main (SW Wilson Court), per note 2 on sheet 4 | EA | 1.00 | |
B-7 | Connection to Existing 12” Water Main (SW Hart Road), per note 3 on sheet 8 | EA | 1.00 | |
B-8 | Connection to Existing 6” Water Main (SW Hart Road/SW Kimberly Court), per note 4 on sheet 10 | EA | 1.00 | |
B-9 | Connection to Existing 8” Water Main (SW Hart Road), per note 4 on sheet 10 | EA | 1.00 | |
B-10 | Connection to Existing 8” Water Main (SW Wilson Drive), per note 9 on sheet 13 | EA | 1.00 | |
B-11 | Connection to Existing 6” Water Main (SW Kimberly Drive), per note 3 on sheet 15 | EA | 1.00 | |
B-12 | Abandoning Existing Water Structures (Ex Valves, Mains, Services) | LS | 1.00 | |
B-13 | 6” RSGV | EA | 3.00 | |
B-14 | 8” RSGV | EA | 2.00 | |
B-15 | 12” RSGV | EA | 3.00 | |
B-16 | 1" Combination Air Release/Air Vacuum Valve Assembly | EA | 1.00 | |
B-17 | Fire Hydrant Assembly with 6" RSGV | EA | 3.00 | |
B-18 | Remove Existing Fire Hydrant Assembly | EA | 3.00 | |
B-19 | 1" Water Service Connection, Domestic | EA | 31.00 | |
B-20 | Plumbing Connection Backside, Domestic | EA | 31.00 | |
B-21 | 1-1/2" Water Service Connection, Irrigation | EA | 2.00 | |
B-22 | Plumbing Connection Backside, Irrigation | EA | 2.00 |
Attachments
This project has the following solicitation documents.
Pre-Bid Conference
NON-MANDATORY PRE-BID CONFERENCE: A pre-bid conference for this project will be held at 10:00 a.m. on 2/2/2023 on Zoom at:
https://www.zoomgov.com/my/beavertonprocurement
Pre-Bid Conference Date |
Feb 2, 2023 10:00AM
(Pacific Standard Time)
|
Vendor Questions and Answers
Submitted Questions About This Bid
These are vendor questions for which the agency has supplied an answer.
Questions | |
---|---|
with supply chains still behind is the city willing to work with contractors on the tentative completion date in the bid docs? if so should the bids required calendar schedule have the actual tentative start date we expect to have materials by? or should we stick with the ntp in the bid so as not to get disqualified on a technicality? |
Asked Jan 25, 2023 12:05PM
|
Answer:
The City of Beaverton prefers that the tentative construction schedule reflect the actual/realistic timeline and start date that accounts for materials delays. This is preferred and will not disqualify the proposing vendor from being a responsive bidder on the bid. |