Project #: TR2412 (ITB)
Business Unit: Engineering
Category: CIP
Department: Public Works
Issued by: City of Redmond, OR
Publish Date: Mar 9, 2026 3:00PM
Bids Due Date: Apr 10, 2026 2:00PM (Pacific Daylight Time) add to calendar
Estimated Project Date: 2026
Status: Awarded
Awarded On: Apr 28, 2026 7:00PM (Pacific Daylight Time)
Award Issued To: Taylor Northwest

Description

The NW 19th St & NW Maple Ave Traffic Signal Project #TR2412 (Project) includes the reconstruction of the NW 19th Street and NW Maple Avenue intersection. Project also includes the installation of traffic signals to replace the existing four-way stop traffic controls. The City estimates the cost of improvements at $1,200,000. All workmanship, materials, and conditions shall conform to applicable construction codes, Specifications included on plans, any special provisions included in these documents, issued addendums, the General Conditions, Special Provisions, Redmond Standards & Specifications 2024 and any Supplementary Conditions.



Special Instructions

The mandatory pre-bid meeting for this invitation to bid has been canceled as of 3/17/26. Please submit questions through the Bid Locker site, as needed. 

Line Items

This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:

Item No Item Unit of Measure Quantity Cost Fixed Costs Required?
1 Mobilization LS 1.00 Cost Requested Required
2 Temporary Traffic Control LS 1.00 Cost Requested Required
3 Erosion and Sediment Control LS 1.00 Cost Requested Required
4 Construction Survey Work LS 1.00 Cost Requested Required
5 Filling and Abandoning of Pipes (00310) LF 80.00 Cost Requested Required
6 Clearing and Grubbing LS 1.00 Cost Requested Required
7 General Excavation LS 1.00 Cost Requested Required
8 12 Inch PVC Pipe LF 163.00 Cost Requested Required
9 Concrete Inlets, Type CG-3 EA 3.00 Cost Requested Required
10 Concrete Manholes, Sedimentation EA 1.00 Cost Requested Required
11 Concrete Manholes, Large Precast EA 1.00 Cost Requested Required
12 Aggregate Base CY 370.00 Cost Requested Required
13 Asphalt Concrete TON 1280.00 Cost Requested Required
14 Concrete Curbs, Standard LF/EA 510.00 Cost Requested Required
15 Sidewalks SF 800.00 Cost Requested Required
16 Curb Ramps SF 1400.00 Cost Requested Required
17 Utility Field Exploration LS 1.00 Cost Requested Required
18 Utility Conflict Resolution $ 1.00 $25,000.00 Required
19 Longitudinal Pavement Markings - Paint (00860) LF 2015.00 Cost Requested Required
20 Pavement Legend, Type B-HS: Arrows (00867) SF 16.00 Cost Requested Required
21 Pavement Legend, Type B-HS: Bicycle Lane Stencil (00867) SF 32.00 Cost Requested Required
22 Pavement Bar, Type B-HS: Standard Crosswalk (00867) SF 392.00 Cost Requested Required
23 Remove and Reinstall Existing Signs (00905) LS 1.00 Cost Requested Required
24 Wood Sign Posts (00910) EA 1.00 Cost Requested Required
25 Signs, Standard Sheeting, Sheet Aluminium (00940) SF 53.00 Cost Requested Required
26 Traffic Signal Installation, NW 19th and Maple (00990) LS 1.00 Cost Requested Required
27 Bark Mulch (01040) CY 7.00 Cost Requested Required
28 Record Drawings LS 1.00 Cost Requested Required
29 Removal of Structures EA 2.00 Cost Requested Required

Download Line Items as .CSV

Attachments

This project has the following solicitation documents.

Bid Document File Size Notes
1,318,784
11,106,632
15,821,889
47,834 Addendum
47,845 Addendum
51,012 Addendum
626,890
48,184 Addendum
304,862 Bid Tabulation
46,605 Notice of Intent to Award

You will need to:

  • Unchecked Be logged into Bid Locker
  • Unchecked Be registered with City of Redmond, OR
  • Unchecked Express interest using the "Express Interest" button above

Vendor Questions and Answers

Submitted Questions About This Bid

City of Redmond, OR has not yet posted any answers to submitted questions. When they do, their answers will appear here.

For Questions or Additional Information, Contact:

Single Point of Contact (SPC)

Lorelei Williams, Public Works Business Manager
(541) 504-2043
lorelei.williams@redmondoregon.ogv

Commodity Codes and Solicitation Change History

Commodity Codes (NIGP):

550-85
Traffic Signal Poles, Standards, And Brackets
550-88
Traffic Signals And Equipment, Electric Systems
912-44
Excavation Services
913-19
Construction, Curb And Gutter, Including Maintenance, Repair, And Removal Services
913-27
Construction, Highway And Road
913-47
Construction, Sidewalk And Driveway, Including Pedestrian And Handicap Ramps
913-96
Paving And Resurfacing, Streets, Major And Residential
968-82
Traffic Signal Installation
968-84
Traffic Control Services, Including Placement And Removal Of Control Devices

Changes to This Listing:

Change Date Is Addendum?
The prebid conference has been added.
Mar 16, 2026 Is an Addendum
The pre-bid conference state changed.
Mar 17, 2026 Is an Addendum
The following bid documents were added:
Addendum 3 - Questions and Answers.pdf
Apr 7, 2026
The following bid documents were added:
040726 Revision - EXHIBIT 5 - Special Provisions.pdf
Apr 7, 2026 Is an Addendum
The following bid documents were added:
Intent to Award - City of Redmond, OR - ITB: NW 19th St & NW Maple Ave Traffic Signal Project.pdf
Apr 13, 2026

About City of Redmond, OR

Redmond is a mid-sized community nestled in Oregon’s High Desert Plateau just east of the Cascade Mountain Range in Central Oregon. Known for its progressive and innovative leadership, the City enjoys a state-wide reputation for its ability to undertake and implement projects and programs that benefit its current and future residents.

The City of Redmond serves a community of approximately 37,000 residents and numerous tourists that visit the region annually. City leadership is dedicated to fostering a business-friendly climate where traditional family-owned enterprises, high-tech industries, and a variety of major corporations all thrive. We look forward to working with businesses who want to offer their services to the organization and community.

Share: