Solicitation Type: ITB
Issued by: Tualatin Valley Water District
Publish Date: Oct 28, 2026 12:00AM
Bids Due Date: Nov 19, 2026 2:00PM (Pacific Standard Time) add to calendar
Status: Open

Description

Sealed bids for the construction of the 176th & Sugar Plum Main Replacement, Project No. C12946 (Project) for Tualatin Valley Water District (Owner) will be accepted electronically at https://bidlocker.us/details/6398_176Th_Sugar_Plum_Main_Replacement_Itb (Bid Locker), until 2:00 p.m. local time on November 19, 2026 (Bid Closing Time). Bidders must sign up with Bid Locker at https://bidlocker.us/a/tvwd/BidLocker before being allowed to submit a bid. There is no cost to register. Any bids received after the Bid Closing Time will not be considered.

The single point of contact for this bid is Heather Speight, Procurement and Contracts Administrator, and can be reached at bidsandproposals@tvwd.org.

Registration with Bid Locker requires a correctly completed Confidentiality Agreement, which is available through the registration process. Following completion of the requested vendor information and upload of the Confidentiality Agreement, the vendor profile will be sent for manual approval. Please allow one business day for the vendor profile to be approved. If it has not been approved within one business day, or if there are questions about this process, please contact bidsandproposals@tvwd.org. Bidders are advised to ensure that their Bid Locker vendor profile is active and approved a minimum of three business days prior to the Bid Closing Time to prevent any issues with submitting a bid on time.

Bids received by the Bid Closing Time will be publicly opened and read aloud immediately thereafter on a conference call at 971.300.4841, phone conference ID 952 891 062#. Interested parties who wish to view the electronic bid opening shall request an electronic Teams meeting invitation by emailing bidsandproposals@tvwd.org by 4:00 p.m. on November 18, 2026. Requests received after this time are not guaranteed to receive the Teams invitation and may still call in at the number provided.

Bidders are required to submit a First Tier Subcontractor Disclosure Form (First Tiers), as described by ORS 279C.370. The First Tiers must be submitted to Bid Locker within two hours of the Bid Closing Time. The Owner must reject a bid if the Bidder fails to submit the First Tiers to Bid Locker within two hours of the Bid Closing Time. Original copies of the Bid Guarantee must be submitted to Owner as prescribed in Section 00 21 13.

The Project consists of furnishing required labor, equipment, and materials for construction of the following:

The replacement of approximately 5,290 linear feet of 4- and 6-inch cast iron water main with 4- and 8-inch ductile iron pipe, and 140 linear feet of 12-inch HDPE horizontal directional drill, including all services, hydrants, appurtenances, and fittings as shown on the plans. The Project includes abandonment of existing main, surface restoration, traffic control, and erosion control in the vicinity of SW 176th Ave and SW Sugar Plum Ln in Washington County, OR.

The Engineer’s estimate for this Project is $2,275,000.

All work is to be completed by June 30, 2027 according to the schedule provided in the Contract documents. District intends to issue Notice to Proceed date no later than January 11, 2027.

Bid Documents may be obtained electronically from Bid Locker or in in either electronic or hard copy format by contacting Plan Center Northwest, PO Box 2486, Clackamas, OR 97015, Phone: 503.650.0148, e-mail: megan@plancenternw.com, plancenternw.com. If a potential Bidder obtains the Bid documents from Plan Center Northwest, the Bidder is still responsible for registering with Bid Locker to submit their bid.

Addenda will be published to Bid Locker. Bidders who download bid packages from Bid locker will automatically be notified via email when addenda are published. It is the responsibility of the Bidder to obtain all addenda. Bidders are responsible for the cost of obtaining and/or printing the Bid Documents. The Bidder, including subcontractors, will also be responsible for signing a confidentiality agreement prior to obtaining the documents. Return of the documents is not required, and the amount paid for the Bid Documents is nonrefundable.

Bidders are strongly encouraged to attend the optional pre-bid conference for this Project on November 4, 2026 at 2:00 p.m. local time via Microsoft Teams. Interested Bidders must email bidsandproposals@tvwd.org by November 3, 2026 at 4:00 PM for a calendar invitation.

Contractors must be qualified in accordance with the applicable parts of ORS 279 to enter into a contract with the Owner for public work in Oregon. Bidders are required to complete and submit Section 00 45 13, “Statement of Bidder’s Qualifications” with their bid. The Owner will investigate and determine if the qualifications of the apparent low Bidder meet the minimum requirements as part of its evaluation of the lowest responsive and responsible bid.

No bid will be received or considered by the Owner unless the Bid Form contains, or is accompanied by, a statement by the Bidder as a part of the bid that the provisions required by ORS 279C.800 through 279C.870 pertaining to prevailing wages are included in this Contract. Contractor licensing under ORS 468A.720 for asbestos abatement is not a requirement for this Project. Each bid must contain a statement as to whether the bidder is a resident bidder as defined in ORS 279A.120. Each bid must contain a statement as to whether the bidder is registered with the Oregon Construction Contractors Board in accordance with the provisions of ORS 279C.365.

Bids must be submitted on the prescribed forms and must be accompanied by a certified check or bid bond executed in favor of Tualatin Valley Water District in an amount equal to five (5) percent of the amount bid as described in Paragraph 11.1 of Section 00 21 13 Instructions to Bidders. The successful Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract as prescribed in the Contract Documents.

The Owner reserves the right to reject all bids not in compliance with all prescribed public contracting procedures and requirements, including bidder responsibility under ORS 279C.375(3)(b), and may reject for good cause all bids upon the Owner’s finding that it is in the Owner’s or the public’s best interest to do so. The Owner reserves the right to waive informalities and to award a Contract to the qualified lowest responsive and responsible Bidder.

Published October 28, 2026.



Line Items

This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:

Item No Item Unit of Measure Quantity Cost Required?
1 Mobilization (Max 5% of Bid Total) LS 1.00 Cost Requested Required
2 Health & Safety LS 1.00 Cost Requested Required
3 Temporary Traffic Control LS 1.00 Cost Requested Required
4 Erosion Control LS 1.00 Cost Requested Required
5 Construction Survey LS 1.00 Cost Requested Required
6 Horizontal Directional Drilling, 12-inch HDPE, PE4710, DR 11 LF 139.00 Cost Requested Required
7 4-inch Ductile Iron Pipe LF 656.00 Cost Requested Required
8 6-inch Ductile Iron Pipe LF 8.00 Cost Requested Required
9 8-inch Ductile Iron Pipe LF 4627.00 Cost Requested Required
10 12-inch Ductile Iron Pipe LF 6.00 Cost Requested Required
11 6-inch Small Ductile Iron Fitting EA 12.00 Cost Requested Required
12 8-inch Small Ductile Iron Fitting EA 76.00 Cost Requested Required
13 12-inch Small Ductile Iron Fitting EA 4.00 Cost Requested Required
14 6-inch Large Ductile Iron Fitting EA 1.00 Cost Requested Required
15 8-inch Large Ductile Iron Fitting EA 14.00 Cost Requested Required
16 6-inch Gate Valve EA 1.00 Cost Requested Required
17 8-inch Gate Valve EA 23.00 Cost Requested Required
18 Fire Hydrant Assembly including 6-inch Gate Valve EA 6.00 Cost Requested Required
19 Water Service Reconnection EA 96.00 Cost Requested Required
20 6x6 Hot Tap Connection EA 3.00 Cost Requested Required
21 12x8 Hot Tap Connection EA 1.00 Cost Requested Required
22 Concrete Straddle Block EA 2.00 Cost Requested Required
23 2-inch Blow-off Assembly EA 6.00 Cost Requested Required
24 2-inch Combination Air Release Valve Assembly EA 5.00 Cost Requested Required
25 Remove Existing Valve Can EA 31.00 Cost Requested Required
26 Remove Existing Hydrant EA 3.00 Cost Requested Required
27 Pipeline Cleaning, Testing, and Disinfection LS 1.00 Cost Requested Required
28 Connection to Existing Water System EA 3.00 Cost Requested Required
29 Abandon Existing Water System LS 1.00 Cost Requested Required
30 Sanitary Sewer Lateral Replacement EA 1.00 Cost Requested Required
31 Remove and Replace Concrete Curb LF 534.00 Cost Requested Required
32 Remove and Replace Concrete Curb and Gutter LF 36.00 Cost Requested Required
33 Remove and Replace Concrete Sidewalk SY 254.00 Cost Requested Required
34 Remove and Replace Concrete Driveway SY 12.00 Cost Requested Required
35 Permanent Asphalt Concrete Trench Restoration TN 735.00 Cost Requested Required
36 Miscellaneous Surface Restoration LS 1.00 Cost Requested Required

Download Line Items as .CSV

Line 1: Mobilization may not exceed 5% of total bid. Check math carefully to ensure responsiveness.

Attachments

This project has the following solicitation documents.

Bid Document File Size Notes
5,523,346
2,199,634
21,708,528
29,182,682
128,808
2,334,758
8,277,457
59,767,180
161,217
104,318

You will need to:

  • Unchecked Be logged into Bid Locker
  • Unchecked Be registered with Tualatin Valley Water District

Pre-Bid Conference Information

Bidders are strongly encouraged to attend the optional pre-bid conference for this Project on November 4, 2026 at 2:00 p.m. local time via Microsoft Teams. Interested Bidders must email bidsandproposals@tvwd.org by November 3, 2026 at 4:00 PM for a calendar invitation.

Conference Date and Registration

Nov 4, 2026 2:00PM (Pacific Standard Time) add to calendar

Before you can register your attendance, you will need to register your vendor profile with Tualatin Valley Water District using the "Register" button below.

Register with Tualatin Valley Water District

Pre-Bid Conference Registrant List

These are the vendors who have registered for the pre-bid conference:

Business When Is Attending Has Attended
Emery & Sons Construction Group, LLC Nov 9, 2026 Has Attended
Fulcrum Construction & Bulding Services, LLC Nov 9, 2026 Has Attended
J.W. Fowler Nov 9, 2026 Has Attended
J.W. Fowler Nov 9, 2026 Has Attended
K&E Excavating, Inc. Nov 9, 2026 Has Attended
K5 Underground Nov 9, 2026 Has Attended
Landis & Landis Construction Nov 9, 2026 Has Attended
Landis & Landis Construction Nov 9, 2026 Has Attended
Rain for Rent Nov 9, 2026 Has Attended
The MEI Group Nov 9, 2026 Has Attended
Titan Utilities, LLC Nov 9, 2026 Has Attended
Titan Utilities, LLC Nov 9, 2026 Has Attended
Trenchline Construction Nov 9, 2026 Has Attended
WSP USA, Inc. Nov 9, 2026 Has Attended

Vendor Questions and Answers

Submitted Questions About This Bid

Tualatin Valley Water District has not yet posted any answers to submitted questions. When they do, their answers will appear here.

For Questions or Additional Information, Contact:

Name: Heather Speight
Email: bidsandproposals@tvwd.org

Interested Parties and Planholders

Interested Parties

These are the vendors who have expressed interest in this solicitation:

Business When
Braun Construction & Design, LLC Oct 28, 2026
Brix Paving Northwest Inc. Oct 30, 2026
(sub)
Canby Excavating Oct 28, 2026
(prime)
Canby Excavating, Inc Oct 28, 2026
(prime)
Civilworks NW, Inc. Nov 6, 2026
(prime)
Core And Main Oct 28, 2026
(other)
D&T Excavation, Inc. Oct 29, 2026
(prime)
DJC Oregon Project Center Oct 28, 2026
(plan center)
Emery & Sons Construction Group, LLC Oct 28, 2026
(prime)
Fulcrum Construction Nov 2, 2026
(prime)
James W. Fowler Co. Oct 30, 2026
(prime)
K&E Excavating, Inc. Oct 30, 2026
(prime)
Moore Excavation Inc. Oct 28, 2026
(prime)
Pacific Excavation Inc Nov 2, 2026
(prime)
Pacific Underground Co. Nov 10, 2026
(sub)
Plan Center Northwest Oct 28, 2026
(plan center)
Rio Underground Construction, LLC Oct 28, 2026
(prime)
Rooney Dirt Works Nov 13, 2026
(prime)
Salem Contractors Exchange Oct 29, 2026
(plan center)
Seattle Daily Journal of Commerce Oct 28, 2026
(plan center)
SLE Inc. Oct 29, 2026
(prime)
Spokane Regional Plan Center Oct 28, 2026
(plan center)
The Saunders Company Oct 28, 2026
(prime)
Titan Utilities, LLC Nov 11, 2026
(prime)
Trench Line Excavation, Inc. Oct 28, 2026
(prime)
Wickwire contracting LLC Nov 17, 2026
(prime)

Planholders

These are the vendors who have downloaded the solicitation documents:

Business When
Bedrock Commercial Concrete Cutting LLC Nov 12, 2026
Braun Construction & Design, LLC Oct 28, 2026
Brix Paving Northwest Inc. Nov 5, 2026
Canby Excavating Nov 10, 2026
Canby Excavating, Inc Oct 28, 2026
Canby Excavating, Inc. Nov 10, 2026
Certerra Oct 29, 2026
Civilworks NW, Inc. Nov 6, 2026
Consolidated Supply Co. Nov 17, 2026
Core And Main Oct 28, 2026
D&T Excavation, Inc Nov 16, 2026
D&T Excavation, Inc. Oct 29, 2026
Dirt and Aggregate Interchange Oct 28, 2026
Emery & Sons Construction Group, LLC Oct 28, 2026
Fulcrum Construction Nov 2, 2026
High Quality Traffic Control, LLC Nov 15, 2026
Hilea Excavating LLC. Nov 17, 2026
Hoss Paving, Inc. Nov 17, 2026
James W. Fowler Co. Oct 29, 2026
Jesse Rodriguez Construction LLC Nov 17, 2026
K&E Excavating, Inc. Oct 30, 2026
Kerr Contractors Oregon, LLC Oct 30, 2026
Landis & Landis Construction Oct 28, 2026
(prime)
Moore Excavation Inc. Oct 28, 2026
Na Koa Utilities LLC Nov 5, 2026
North Santiam Paving Co. Nov 2, 2026
Pacific Excavation Inc Nov 2, 2026
Pacific Underground Co. Oct 28, 2026
Rooney Dirt Works Nov 12, 2026
Rotschy, LLC. Oct 29, 2026
Signature Paving Services, Inc. Oct 28, 2026
SLE Inc. Oct 29, 2026
Titan Utilities, LLC Nov 11, 2026
Top Grade Plumbing, LLC Oct 28, 2026
Trench Line Excavation, Inc. Oct 28, 2026
Wallis Engineering Nov 4, 2026
Western Oilfields Supply Company Nov 4, 2026
Wickwire contracting LLC Nov 17, 2026

Commodity Codes and Solicitation Change History

Commodity Codes (NIGP):

913-60
Construction, Water System, Plants, Main And Service Line
913-92
Maintenance And Repair, Water System, Main And Service Line

Changes to This Listing:

Change Date Is Addendum?
The following bid documents were added:
176th & Sugar Plum ITB 2027-004 Addendum 1.pdf
Appendix C - Final TVWD Butternut Creek Final GDR.pdf
176th & Sugar Plum ITB Pre-Bid Conference recording.mp4
The following bid documents were removed:
Appendix C - TVWD Butternut Creek Draft GDR - Unsecured.pdf
Nov 4, 2026 Is an Addendum
The following bid documents were added:
176th & Sugar Plum ITB 2027-004 Addendum 2.pdf
Nov 10, 2026 Is an Addendum
The following bid documents were added:
176th & Sugar Plum ITB 2027-004 Clarification 1 .pdf
Nov 17, 2026 Is an Addendum

About Tualatin Valley Water District

Contracting with TVWD

TVWD is a special district, established to provide drinking water, and is governed by an elected Board of Commissioners.  Because some of the information in our solicitations is confidential and protected under US law, all vendors are required to complete a Confidentiality Agreement prior to their TVWD Bid Locker profile being approved. This approval is a manual process.  Please allow one business day for approval and follow any emailed instructions received. TVWD is not responsible for vendors who cannot download and/or submit solicitation responses due to vendor profiles that are not approved.

Public agencies with questions about a solicitation should call 503.848.3055 or email bidsandproposals@tvwd.org for information.  Vendors who reach out directly may be redirected to the instructions in the specific solicitation or other emailed instructions.

Share: