Project #: RFP #1753 (RFP)
Category: Construction
Department: Construction
Issued by: Portland State University
Publish Date: Oct 14, 2026 4:00PM
Proposals Due Date: Nov 12, 2026 2:00PM (Pacific Standard Time) add to calendar
Status: Closed

Description

Project: Portland State University (“PSU” or “Owner”) is proposing to relocate SPHR in order to support operations. The Speech and Hearing Remodel and Relocation project is building out the 4th-floor (13,335 sf) within RMNC (excluding vertical core elements such as stairs and elevators). The project scope transitions existing open-office layouts into enclosed administrative, academic, and clinical environments. Programmed areas include faculty/staff offices, dry research labs, classrooms, a public-facing reception area, staff breakroom, specialized viewing rooms, new single-occupancy restrooms, student study space with a kitchenette, and sink alcoves. Due to precise operational requirements across clinical and research programs, high-performance acoustic isolation and sound-attenuation assemblies are required throughout.



Special Instructions

Only Proposers who have representatives at the site-walk meetings will be allowed to propose. A mandatory in-person site-walk meeting will be conducted at the Richard and Maurine Neuberger Center (RMNC), 1600 SW 4th Avenue, Portland, OR 97201 building lobby on October 22, 2026 at 11:00 AM, local time.Prime bidders who arrive in the meetings more than five minutes after the start time of the meeting (as stated in the solicitation and by the PSU representative’s watch) or after the discussion portion of the meeting (whichever comes first) may not be permitted to submit a proposal on the project.

Attachments

This project has the following solicitation documents.

Bid Document File Size Notes
515,944
626,087
410,327
399,107
558,770
48,978,274
361,027
4,178,575
15,441,067
5,783,884
2,039,459
259,018
13,011,027
1,318,766
1,824,089
12,059,822
44,545,386
435,041
317,306
4,517,345
9,137,197
6,415,101
473,536
287,787
534,552
212,423
807,634
287,387
225,849
455,534

For Questions or Additional Information, Contact:

Name: Bethany DeMello
Email: bdemello@pdx.edu

Interested Parties and Planholders

Interested Parties

These are the vendors who have expressed interest in this solicitation:

Business When
AC Schommer & Sons, Inc Oct 15, 2026
(prime)
Andersen Construction Oct 19, 2026
(prime)
Artis Builds Oct 27, 2026
(prime)
Builders Exchange of Washington, Inc. Oct 15, 2026
(plan center)
Cochran Inc Oct 20, 2026
(sole)
ConstructConnect Oct 28, 2026
(plan center)
Denali Construction Inc. Oct 15, 2026
(prime)
DJC Oregon Project Center Oct 16, 2026
(plan center)
Eugene Builders Exchange Oct 16, 2026
(plan center)
Fulcrum Construction Oct 19, 2026
(prime)
Fulcrum Construction Oct 20, 2026
(prime)
Ink Built Architecture Oct 19, 2026
(prime)
INLINE Commercial Construction Oct 15, 2026
(prime)
Lease Crutcher Lewis Oct 17, 2026
(prime)
Plan Center Northwest Oct 15, 2026
(plan center)
Premier Builders Exchange Oct 27, 2026
(other)
Salem Contractors Exchange Oct 16, 2026
(plan center)
Savatree LLC Nov 12, 2026
(other)
Scorpion Surface Cleaning LLC Nov 6, 2026
(sub)
Seattle Daily Journal of Commerce Oct 15, 2026
(plan center)
Skyward Construction Oct 28, 2026
(prime)
Spokane Regional Plan Center Oct 16, 2026
(plan center)
StoreAndStock LLC Oct 20, 2026
(prime)
Sturgeon Electric Company Oct 15, 2026
The Arcus Group Nov 2, 2026
(sole)
TJ Nisbet Construction Oct 15, 2026
(prime)
Truebeck Construction Oct 16, 2026
(prime)
Truebeck Construction Oct 16, 2026
(sole)

Planholders

These are the vendors who have downloaded the solicitation documents:

Business Contact Name Contact Phone When
3 Kings Environmental Ron King 3606665464 Oct 30, 2026
AC Schommer & Sons, Inc Hiliary Demmer 5032874646 Oct 15, 2026
Advanced Tribal LLC Mona 5039302491 Oct 19, 2026
Andersen Construction Phil Kennedy 503-283-6712 Oct 19, 2026
Artis Builds Claire Heitschmidt 360-947-4413 Oct 26, 2026
Balfour Beatty construction, LLC Troy Dickson 5032200895 Oct 27, 2026
Blackridge Research & consulti Venkatesh Siva 917 993 7467 Oct 16, 2026
Builders Exchange of Washington, Inc. Tina Spah 425-258-1303 Oct 15, 2026
Cochran Inc Scott Buche 5035237376 Oct 20, 2026
ConstructConnect Michael Stubbs 5134585981 Oct 28, 2026
Denali Construction Inc. Jonathan Barnes 5035722928 Nov 5, 2026
DJC Oregon Project Center Plan Room 503-274-0624 Oct 16, 2026
Eugene Builders Exchange Jeremy Moritz 541-484-5331 Oct 16, 2026
Fulcrum Construction Seon Choi 5412077923 Oct 19, 2026
Fulcrum Construction Tracey Mason 5036446351 Oct 20, 2026
Ink Built Architecture Melynda Retallack 5037015277 Oct 19, 2026
INLINE Commercial Construction Jeff Rule 5036425117 Oct 15, 2026
Interface Engineering, Inc. Kim De Alba 503-382-2266 Nov 2, 2026
JE John Construction Greg Nourse 503-780-0333 Oct 26, 2026
Korta Wise Zach Wise 503.862.8214 Oct 15, 2026
Lease Crutcher Lewis Katie Morrison 5037980065 Oct 17, 2026
Metro Tint Zack Williamson 503-222-2259 Nov 11, 2026
Par-Tech Construction, Inc. Ben Parsons 5035578300 Oct 19, 2026
Plan Center Northwest Megan Verdoorn 503-650-0148 Oct 15, 2026
(plan center)
PMG Asbestos Contractor Cynthia Martinez 5037615924 Oct 28, 2026
Premier Builders Exchange Connie Briese 5413890123 Oct 27, 2026
PSU Carrie Ficek 50 Oct 23, 2026
Pwxpress Mary Miller 4086768941 Oct 19, 2026
RA Build Group, LLC Tyler Redman 5036892996 Oct 27, 2026
Razumovsky Construction LLC Crystal Clark 9712424048 Oct 18, 2026
Rider Levett Bucknall Ltd. Baileigh Nigro 5032262730 Oct 22, 2026
Salem Contractors Exchange Lori Cooley 503-362-7957 Oct 16, 2026
Savatree LLC Angela Fajardo 503-645-2242 Nov 12, 2026
Scorpion Surface Cleaning LLC Vincent West 5033898993 Nov 6, 2026
Seattle Daily Journal of Commerce L Heberlein 2066228272 Oct 15, 2026
Skyward Construction Erica Cheek 360-546-1625 Oct 28, 2026
Soliz Customs Innovations David Soliz 5039024774 Nov 6, 2026
Southwest Washington Contractors Association Sherrie Jones 3606947922 Oct 15, 2026
Spokane Regional Plan Center Jenny Martin 509-328-9600 Oct 16, 2026
StoreAndStock LLC Garrett Wilcoxson 541-206-9929 Nov 2, 2026
Sturgeon Electric Company Wanda Delaney 303-345-4702 Oct 15, 2026
Swinerton Shea Anderson (503) 224-6888 Oct 15, 2026
TJ Nisbet Construction Andrew Holdeman 5032570308 Oct 15, 2026
Truebeck Construction John Hartman 5037437070 Oct 16, 2026
Truebeck Construction Connie Hotovec 5035098112 Oct 16, 2026
UWD PreBuild, Inc Kimberly S Caminschi 15035167475 Nov 11, 2026
Willamette Express Ltd. David Jackson 5035135118 Nov 12, 2026

Solicitation Keyword Tags

Construction, General Contractor

Commodity Codes and Solicitation Change History

Commodity Codes (NIGP):

909-00
BUILDING CONSTRUCTION SERVICES, NEW, INCLUDING MAINTENANCE AND REPAIR SERVICES
909-22
Building Construction, Non-Residential, Office Bldg., Etc.
909-24
Building Construction, Commercial And Institutional
909-30
Building Construction, (Not Otherwise Classified)
912-00
CONSTRUCTION SERVICES, GENERAL, INCLUDING MAINTENANCE AND REPAIR SERVICES)
914-00
CONSTRUCTION SERVICES, TRADES, NEW CONSTRUCTION

Changes to This Listing:

Change Date Is Addendum?
The following bid documents were added:
RFP #1753 RMNC SPHR Remodel & Relocation Addendum 01.pdf
RFP #1753 SPHR Remodel Mandatory Site-Walk Attendee List.pdf
Oct 26, 2026 Is an Addendum
The following bid documents were added:
RFP #1753 RMNC SPHR Remodel & Relocation Addendum 02.pdf
Oct 30, 2026 Is an Addendum
The bid due date has changed.
The following bid documents were added:
4.07.01 Arch Spec 100%-20261030T190717Z-1-001.zip
4.07.02 Elect Spec 100%-20261030T190749Z-1-001.zip
4.08 RMNC Remodel for SPHR - Specifications.zip
4.14 Asbestos & Lead Paint Reports - RMNC 4th Fl - 2026.pdf
4.15 SPHR - FULL SET - Issued for Bid and Permit_Stamped 09-04-2026-3.pdf
RFP #1753 RMNC SPHR Remodel & Relocation Addendum 03.pdf
The following bid documents were removed:
4.07 RMNC Remodel for SPHR - Drawings.zip
4.08 RMNC Remodel for SPHR - Specifications.zip
Oct 30, 2026 Is an Addendum
The following bid documents were added:
4.06 PSU Bid Form and Bid Security Form REV 11.05.26.pdf
4.16 PSU Example Public Improvement Agreement.pdf
4.17 SPHR_ A100 Rev2.pdf
4.18 SPHR_RMNC_Electrical_Rev01.pdf
4.19 Sub Req 1 - Frasch Linyfelt - RMNC (1 of 2) Signed 11.03.2026.pdf
4.20 Sub Req 2 - Frasch Blade BAFL - RMNC (2 of 2) Signed 11.03.2026.pdf
RFP #1753 RMNC SPHR Remodel & Relocation Addendum 04.pdf
The following bid documents were removed:
4.06 PSU Bid Form.pdf
Nov 5, 2026 Is an Addendum