Zone 5 Storm System Cleaning Project
| Solicitation Type: | ITB |
|---|---|
| Issued by: | Oak Lodge Water Services |
| Publish Date: | Aug 26, 2026 2:00PM |
| Bids Due Date: |
Sep 9, 2026 2:00PM
(Pacific Daylight Time)
|
| Price Range: | 44,568-54,471 |
| Status: | Awarded |
Description
Bids Due and Bid Closing Date and Time: 2:00 PM PST, September 9, 2026.
Oak Lodge Water Services is seeking quotes from qualified and experienced contractors able to provide cleaning services for the Zone 5 Storm System Cleaning Project.
The project consists of the removal and disposal of debris in 129 catch basins and 1138 linear feet (LF) of pipe in Zone 5 at an agreed upon cost per catch basin and LF of pipe, and tracking and reporting on the cubic yards of debris removed per catch basin and debris removed per stretch of piping.
A link to the GIS map of assets identified for cleaning is here: Catch Basin Cleaning Zone 5 Map.
The OLWS Representative for the Zone 5 Storm System Cleaning Project is:
Lara Christensen
Oak Lodge Water Services
14611 SE River Road
Oak Grove, OR 97267
lara.christensen@olws.org
971-291-4533
Special Instructions
- Any traffic control MUST be considered in the proposed cost.
- Remove and dispose of debris in 129 catch basins in Zone 5 (see attached list and map).
- Remove and dispose of debris in 1138 LF of pipe in Zone 5 (see attached list and map).
- GIS Zone 5 Cleaning Map of catch basins and pipe lengths.
- Remove accumulated debris and sediment from identified assets and dispose in most cost effective environmentally responsible manner according to DEQ and applicable laws.
- Track and REPORT on the cubic yards of debris removed per catch basin.
- Work, invoicing, and reporting must be completed by December 31, 2026.
- Data REPORT must be submitted with final invoice by December 31, 2026.
Line Items
This solicitation has the following line items for which you can submit a bid. Please review the bidding instructions in the bid documents for information on these line items:
| Item No | Item | Unit of Measure | Quantity | Cost | Required? |
|---|---|---|---|---|---|
| 1 | Catch Basins | Each | 129.00 |
|
|
| 2 | Pipe | LF | 1138.00 |
|
|
- GIS Cleaning Map of Zone 5 catch basins and pipe lengths.
- Traffic control must be accounted for in the bid.
Attachments
This project has the following solicitation documents.
You will need to:
Be logged into Bid Locker
Be registered with Oak Lodge Water Services
Vendor Questions and Answers
Submitted Questions About This Bid
These are vendor questions Oak Lodge Water Services has answered. There may be other questions with an answer pending, in case you have submitted a question but don't see it here.
| Questions |
|---|
|
Question:
09/02/2026: "We need a copy of last years winning bid." |
|
Answer:
Item No Item Quantity Unit of Measure Item Cost Item Subtotal Total
1 Catch Basins 110 Each $195.00 $21,450.00
2 Storm Lines 692 LF $20.00 $13,840.00
Subtotals: $35,290.00
$35,290.00
Vendor: Heidi Jeffries <heidij@cleancreek.com> - 3605672400
|
|
Question:
09/04/2026: The GIS map helped confirm that the lines to be jetted are 12” in diameter. Can you confirm how those lines are accessed for jetting? Are there manholes or other access points available along the system? |
|
Answer:
The pipes labeled for cleaning may be accessed through the closest upstream and downstream catch basins on the map that are also labeled for cleaning. |
For Questions or Additional Information, Contact:
Name: Oak Lodge Water Services
Email: procurement@olws.org
Planholders
Planholders
These are the vendors who have downloaded the solicitation documents:
| Business | When |
|---|---|
| Allied Solutions | Sep 3, 2026 |
| ConstructConnect |
Aug 27, 2026
(sole)
|
| Eugene Builders Exchange | Aug 26, 2026 |
| Lovett Services | Sep 3, 2026 |
| Mackay Sposito Constructors, LLC | Sep 8, 2026 |
| Plan Center Northwest |
Aug 27, 2026
(plan center)
|
| Salem Contractors Exchange | Aug 28, 2026 |
| Seattle Daily Journal of Commerce |
Aug 28, 2026
(plan center)
|
| Tri-City Construction Council |
Aug 27, 2026
(plan center)
|
| US Ecology | Aug 27, 2026 |
About Oak Lodge Water Services
Oak Lodge Water Services (OLWS) provides drinking water, wastewater, and watershed protection services to approximately 29,000 residents and businesses in Oak Grove, Jennings Lodge, and parts of Milwaukie and Gladstone.
Our system includes 208 miles of drinking water and wastewater pipes, 3,123 catch basins, and 773 fire hydrants. Additionally, we operate a wastewater treatment plant that processes over 1.5 billion gallons of wastewater each year.
Share:
| Your submitted questions |
|---|